July 15, 2011 | May 5, 2011 | March 24, 2011 | February 23, 2011 | December 22 , 2010 | September 30, 2010 | June 3, 2010 | March 31 , 2010 | February 25 , 2010 | Jamuary 12, 2010 | December 22 , 2009 | September 24, 2009 | April 17, 2009 | April 3, 2009 | March 23, 2009 | February 2, 2009 | December 17, 2008 | March 28, 2008 | December 21, 2007 | September 21, 2007
The following amendments to the 2008-2011 Transportation Improvement Program will be made following a phone vote of the WWW Board on July 15, 2011.
Ohio TIP Project Revisions |
Project # |
Project Description |
Revision |
|
Belpre-Construct two left turn lanes at intersections of SR 7 with Braun Road and Farson Street. Add left turn signal heads at both locations. |
Project construction currently shown in FY 12 at a cost of $789,000. Project cost is being increased to $1,173,760.50.
|
The following amendments to the 2008-2011 Transportation Improvement Program were made following a meeting of the WWW Board on May 5, 2011.
Ohio TIP Project Revisions |
Project # |
Project Description |
Revision |
|
Bridge Demolition and replace with fill – ATH 50 39.10-39.14 LT & RT also includes WAS 124 3.75-3.79. |
The portion within the MPO study area (WAS 124 3.75-7.79) was excluded from the project. Therefore, the project is deleted from the FY 08-11 TIP.
|
|
Construct Park and Ride facilities at WAS 124, ATH 690, and ATH 550 locations.
|
PID 88382 was deleted. The project was incorporated into PID 88406 and moved from FY11 to FY12. The project description includes the construction of 4 park and ride facilities. Intersection of MRG 60 and 266, ATH 33 10.22 WB at the SR 682 Connector Rd., WAS 124 and US 50, and ATH 550 0.25.
Total Project Cost: $1,060,000
|
The following amendments to the 2008-2011 Transportation Improvement Program were made following a phone vote of the WWW Board on March 24, 2011.
Ohio New TIP Projects (Amendments) |
|
|
|
|
PID 90419
WAS-Radio Tower Removal
|
Radio tower located west of District warehouse. Removal of radio tower. Work includes steel removal, concrete base, and grading and seeding site.
|
$20,000
(100% state funds)
|
FY 2011 - Construction
|
The following amendments to the 2008-2011 Transportation Improvement Program were made following a phone vote of the WWW Board on February 23, 2011.
Ohio New TIP Projects (Amendments) |
|
|
|
|
PID 24892
NOB-SR565-0.00
|
Two-lane resurfacing-NOB-565-0.00-2.88 chip seal, WAS-7-23.07-37.31 asphalt overlay, WAS-26-12.44-20.99 chip seal, and WAS-807-0.00-0.24 use an asphalt overlay treatment. |
$1,337,000 |
Project deleted from TIP-revised project no longer has sections within the MPO area. |
|
Culvert liner project – WAS-7-39.79, 45.39, and 52.38. Begin 0.18 miles south of CR 244.
|
$440,000 |
Construction phase added in FY 2011. |
PID 83919
WAS-Marietta River Trail-Phase 3
|
River Trail Phase 3 extension. Beginning at 4th St. near Ohio River and ending on the north side of Duck Creek. Includes the construction of a bridge over Duck Creek. |
$1,232,000 |
Project deleted from FY 08-11 TIP moved to FY 13 |
PID 85029
WAS-Marietta-Armory
|
Rehabilitation of the Marietta Armory Welcome Center on Front Street. |
$2,993,000 |
Project deleted from FY 08-11 TIP moved to FY 13 |
PID 19624
WAS-SR821-0.23
|
Minor realignment. Work includes pavement, guardrails, embankment, and culverts. |
$1,570,773 |
Construction phase deleted from FY 08-11 TIP moved to FY 14. |
PID 82996
WAS-US50-1.97LT
|
Belpre Township-concrete deck overlay on US50 1.97 LT. |
Cost increased from $356,000 to $1,301,161. |
FY 2011 |
PID 84189
WAS-SR124-3.336
|
SR 124 – Culvert liner project. 0.03 miles south of TR 298. |
Cost increased from $553,000 to $984,000. Funding changed from 100% State to 80% Federal STP and 20% state. |
FY 2011 |
PID 87590
WAS-CR9-4.92 |
Two-lane resurfacing project. Begins at CR 46 (Bells Run Rd.)
and ends at CR 544 (Zion Ridge Road). Work includes new guardrail,
pavement markings, and berm conditioning.
|
$581,000 |
FY 2011 |
Ohio TIP Project Revisions |
Project # |
Project Description |
Revision |
PID 85965
WAS-Putnam/7th/Glendale
|
Marietta-Traffic signal and intersection improvements at Putnam Street, Seventh Street, and Glendale Road. Project consists of replacing existing strain poles, span wire, vehicular and pedestrian signal heads, and signal controller. Signal timing and phasing will also be optimized to improve traffic flow and reduce delay. |
Project cost is being increased from $143,000 to $184,000
|
The following amendments to the 2008-2011 Transportation Improvement Program were made following a meeting of the WWW Board on June 3, 2010.
Ohio New TIP Projects (Amendments) |
|
|
|
|
PID 90094
WAS-SR7-9.60
|
SR7-Begin 0.01 mile south of SR 32 underpass. Bridge repair-work includes protective coating paint and concrete patching.
|
$486,000 |
FY 2011 |
CABL/Washington County
LTV Bus
|
Purchase of one replacement Light Transit Vehicle <30’. Purchased through Clean and Green Program.
|
$70,000 |
FY 2011 |
PID 88382
D10 Park and Ride
|
Construct Park and Ride facilities at WAS 124, ATH 690 and ATH 550.
|
$1,082,000 |
FY 2011 |
Ohio TIP Project Revisions |
Project # |
Project Description |
Revision |
PID 83389
WAS-SR7-23.74
|
Marietta Intersection Improvement at Pike St. (SR7) and Acme Street.
|
Project moved from FY 2012 to FY 2013
|
The following amendments to the 2008-2011 Transportation Improvement Program were made following a meeting of the WWW Board on September 30, 2010.
Ohio TIP Project Revisions |
Project # |
Project Description |
Revision |
PID 89094
WAS-CR4-1.76 |
Two-lane resurfacing project using an asphalt overlay treatment. Work includes pavement marking and berm conditioning. Includes WAS-CR79-0.00-0.27. |
$421,900
FY 2015 |
|
Resurfacing project using an asphalt overlay and milling. Work includes curb ramps, pavement markings and inclusion of some counter measures from past traffic safety study. |
$571,503
FY 2014
|
PID 86863
WAS-SR7-22.95
|
Intersection Improvement at Pike, Green and 7th Street |
Engineering phase moved from FY 2010 to FY 2011. MPO funding for the Engineering phase is increased from $160,000 to $304,642 the increase was a result of shifting $144,642 of MPO funds out of the construction phase (scheduled in FY 13). Therefore, reducing MPO funding for construction from $334,208 to $189,566. |
PID 83389
WAS-SR7-23.74
|
Intersection improvement at Pike and Acme Street in Marietta. |
Engineering and Right-of-Way phase moved from FY 2010 to FY 2011. |
The following amendments to the 2008-2011 Transportation Improvement Program were made following a meeting of the WWW Board on June 3, 2010.
Ohio New TIP Projects (Amendments) |
|
|
|
|
PID 88404
WAS-SR60-2.94
|
Begin at SR60 and Colegate Drive intersection. Intersection pavement rehabilitation. Includes WAS-60-3.56-3.60 and WAS-821-0.00-0.04
|
$1,404,000 |
FY 2011 |
PID 25092
WAS-SR 7-20.31
|
SR 7 – Culvert liner project. Begin at 0.12 miles north of TR 7. |
$3,499,000 (project being revised to increase the project cost from $2,160,000). |
FY 2011 |
| PID 88588
Washington County |
Community Action Bus Lines: Purchase one 30 ft. diesel fuel bus. |
$75,000 (funded with 100% State Congestion Mitigation Air Quality funds)
|
FY 2010 |
Ohio TIP Project Revisions |
Project # |
Project Description |
Revision |
PID 87887
WAS-D10-Signs
|
District-wide extrusheet sign replacement project.
|
Project being deleted from TIP in FY 10. Project being moved to FY 16.
|
The following amendments to the 2008-2011 Transportation Improvement Program were made following a meeting of the WWW Board on March 31, 2010.
Ohio TIP Project Revisions |
Project # |
Project Description |
Revision |
PID 87950
WAS-D10-Rumble
|
Rumble strip project on various routes and sections district-wide includes WAS-SR7 from mile post 28.32 to 31.75 and from mile post 33.18-37.26.
|
Total project cost revised from $700,000 to $65,738.31. Federal funding type revised from STIM 2 to HSIP (Highway Safety Improvement Program. |
PID 87952
WAS-D10-Signals
|
Upgrade signals with LED lighting backplates at various locations in District 10. Includes the intersection of SR60 and Davis Avenue.
|
Total project cost revised from $55,000 to $99,375.46. Federal Funding revised from STIM 2 to HSIP (Highway Safety Improvement Program).
|
CABL/Washington County
Intermodal Facility
|
Additional allocation for the Intermodal Passenger Accessibility and Traffic Enhancement Project in Marietta. The additional funding will include electrical work and landscaping.
|
Total Project Cost: $150,824
Schedule: FY 2010
|
CABL/Washington County
LTV Bus
|
Replacement of two Light Transit Vehicles. |
Total Project Cost: $150,000
Schedule: FY 2010
|
CABL/Washington County
Operating
|
Additional operating funds. |
Total Project Cost: $33,425
Schedule: FY 2010
|
The following amendments to the 2008-2011 Transportation Improvement Program were made following a phone vote of the WWW Board on February 25, 2010.
Ohio New TIP Projects (Amendments) |
|
|
|
|
PID 87861
D10 – Park and Ride
|
Construct Park and Ride at Little Hocking US 50/SR 124 location.
|
$2,500,000 |
|
PID 87887
D10-Sign
|
Extrusheet sign replacement project. District-wide. |
$700,000 |
FY 2010 |
PID 87952
LED/Backplates
|
Upgrade signals with LED lighting and utilize backplates at various locations in District 10. |
$55,000 |
FY 2010 |
PID 87950
D10-Rumble Stripes
|
Rumble strip project on various routes and sections District-wide. |
$700,000 |
FY 2010 |
PID 19624
WAS-SR821-0.23
|
Minor realignment, work to include pavement, guardrail, embankment and culverts.
|
$2,050,000 |
FY 2010 |
The following amendments to the 2008-2011 Transportation Improvement Program were made following a meeting of the WWW Board on December 22, 2009.
Ohio New TIP Projects (Amendments) |
|
|
|
|
PID 87563
WAS-US 50-5.68
|
US 50: Slide repair beginning 0.04 miles west of SR 618 overpass. Programmed for PE only
|
$14,360 |
FY 2010 |
PID 87590
WAS-CR 9-4.92
|
CR 9: Two-lane resurfacing project. Begin at CR 46 ( Bells Run Road) and end at CR 544 ( Zion Ridge Road). Work includes new guardrail, pavement marking, and berm conditioning. |
$581,000 |
FY 2012 |
PID 87789
WAS-SR7-21.76
|
Intersection study in the City of Marietta from the recent Washington Street Bridge rehabilitation project limits, east to the Third and Washington Street intersection. |
$30,000 |
FY 2011 |
Ohio TIP Project Revisions |
Project # |
Project Description |
Revision |
PID 83389
WAS-SR 7-23.74
|
Marietta : Intersection improvement at Pike and Acme Street.
|
Add engineering phase in FY 2010 utilizing MPO CMAQ funds ($100,000). Change the amount of MPO CMAQ funds for construction from $525,000 to $425,000. Construction remains in FY 2012.
|
PID 86863
WAS-SR 7-22.97
|
Marietta – Intersection improvement project at Pike, Green, and Seventh Street. |
Add Engineering phase in FY 2011 utilizing MPO CMAQ funds ($160,000). Change the amount of MPO CMAQ funds for construction from $494,208 to $334,208. Construction remains in FY 2013. |
The following amendments to the 2008-2011 Transportation Improvement Program were made following a meeting of the WWW Board on December 22, 2009.
Ohio New TIP Projects (Amendments) |
|
|
|
|
PID 79198|
District 10 – Bridge Painting |
District 10: District wide bridge painting project. |
$2,985,000 |
FY 2011 |
| PID 85029 |
Rehabilitation of the Marietta Armory Welcome Center on Front Street.
|
$315,496 |
FY 2010 |
| PID 87748 |
CR 79 – Begins at TR 32-two-lane resurfacing project. Work includes pavement markings.
|
$635,000 |
FY 2011 |
Ohio TIP Project Revisions |
Project # |
Project Description |
Revision |
PID 85965 |
Traffic signal and intersection improvements at Putnam Street, Seventh Street and Glendale Road.
|
Change in MPO funding type from CMAQ to STP.
|
PID 82799 |
Improvements at the intersection of SR7 with Braun Road and Farson Street in Belpre.
|
Move project from FY 2011 to FY 2012. Total project cost decreased from $765,000 to $541,331. MPO funding changed from CMAQ to STP ($164,780). The project was also revised to include safety funds ($326,551) and City funds ($50,000).
|
| PID 86863 |
Marietta-intersection improvements at Pike, Green and 7th Street.
|
Total project increased from $2,706,000 to $3,333,000. The project cost included the addition of MPO CMAQ funds ($494,208) and local funds ($124,000).
|
PID 83389 |
Marietta-Intersection improvement at Pike (SR7) and Acme Streets. |
Total Project Cost increased from $2,234,000 to $2,434,000. Project cost modified to include Right-of-Way phase ($200,000). |
The following amendments to the 2008-2011 Transportation Improvement Program were made following a phone poll of the WWW Board on September 24, 2009.
Ohio New TIP Projects (Amendments) |
|
|
|
|
PID 79198|
District 10 – Bridge Painting
|
District 10: District wide bridge painting project. |
$2,985,000 |
FY 2011 |
Ohio TIP Project Revisions |
Project # |
Project Description |
Revision |
PID 85965
WAS-Putnam/7th Street/Glendale
|
Marietta-Traffic signal and intersection improvements at Putnam St., Seventh St., and Glendale Road. Project consists of replacing existing strain poles, span wire, vehicular and pedestrian signal heads and signal controller. Signal timing and phasing will also be optimized to improve traffic flow and reduce delay.
|
Total cost increase from $137,000 to $143,000. MPO portion increased from $110,250 to $114,460.
|
PID 85040
WAS-CR25-0.00
|
Two-lane resurfacing project on CR 25. Begin at SR7 and end at CR 244.
|
Total project cost increase from $182,000 to $188,000. MPO portion increased from $144,800 to $149,600.
|
The following amendments to the 2008-2011 Transportation Improvement Program will be made following a phone poll of the WWW Board on April 17, 2009.
Ohio New TIP Projects (Amendments) |
|
|
|
|
PID 86302
WAS-Marietta Resurfacing |
City of Marietta: Resurface up to 5.21 miles on nine different federal-aid city streets using Economic Stimulus funds. |
$1,200,000 |
FY 2010 |
PID 22512
WAS-7-14.06 |
Warren Township : Resurface 3.54 miles of SR7 between mile points 14.06 and 17.60. |
$1,994,000 |
FY 2011 |
PID 85667
WAS-CR2-Guardrail |
Various townships, including Belpre, Durham, Muskingum and Warren: New guardrail on county roads 2, 26, 27, 79, 109 and 805. |
$302,000 |
FY 2010 |
PID 85954
District 10 signal maintenance. |
Maintenance contract funded with all state money. |
$742,000 |
FY 2011 |
Ohio TIP Project Revisions |
Project # |
Project Description |
Revision |
PID 82799|
WAS-50-08.61 |
Belpre: Construct left turn lanes and install left turn signal heads at intersections of SR7/Braun Road and SR7/Farson Street. |
Cost increase from $720,000 to $765,404, and project moved from FY 2010 to FY 2011. |
PID 80843
WAS-50-01.97 LT and RT |
Belpre Township : Painting three bridges on US 50 at mile points 1.97 left, 1.97 right and 4.04. |
Cost increase from $1,620,000 to $1,998,000, federal funding added to the project, and project moved from FY 2010 to FY 2009. |
PID 84447
WAS-60-05.13 |
Muskingum & Adams Townships: Resurface 2-lane highway with asphalt overlay treatment from Mile point 5.13 to 11.23. |
Cost increase from $1,000,000 to $1,102,000. |
PID 84854|
WAS-7-24.97 |
Marietta : Total concrete pavement replacement at 1-77/SR7 interchange. |
Cost increased from $4,347,000 to $4,793,000. |
PID 75615
WAS-124-03.50 |
Little Hocking: Replacement of bridge. |
Cost decreased from $1,367,000 to $1,196,000. |
PID 75693
WAS-618-02.30 |
Belpre: Line an existing culvert with a culvert. |
Cost increased from $379,000 to $457,000. Funding source changed from 100% state to Surface Transportation Program (STP). |
PID 77971
MOE-7-02.21 |
Washington and Monroe counties: Two-lane resurfacing at various locations, including WAS-7-37.31 to 39.12. |
Cost decreased from $1,801,000 to $1,639,000. |
The following amendments will be made to the 2008-2011 Transportation Improvement Program at the April 3, 2009 meeting of the WWW Board.
Ohio New TIP Projects (Amendments) |
|
|
|
|
PID 85965
WAS Putnam/7th Street/Glendale Rd. |
Maretta - Traffic signal and intersection improvements at Putnam Street, Seventh Street, and Glendale Road. Project consists of replacing existing strain poles, span wire, vehicular and pedestrian signal heads, and signal controller. Signal timing and phasing will also be optimized to improve traffic flow and reduce delay.
|
$137,000 |
|
The following amendments to the 2008-2011 Transportation Improvement Program were made following a phone poll of the WWW Board on March 23, 2009.
Ohio New TIP Projects (Amendments) |
|
|
|
|
PID 85945
WAS-Facility Rehabilitation |
Intermodal Facility Accessibility and Enhancement project for the Washington County Community Action Bus Lines.
|
$1,100,000 |
|
PID 85946
WAS-1 Replacement-LTD |
Washington County 1 CABL- 1 replacement Light Transit Vehicle for the Washington County Community Action Bus Lines.
|
|
|
The following amendments will be to the 2008-2011 Transportation Improvement Program following a phone poll of the WWW Board on February 2, 2009.
West Virginia New TIP Projects (Amendments) |
|
|
|
|
Mid-Ohio Valley Transit Authority Bus Replacement |
Replace 8 buses with 6 low-floor transit buses. |
$1,375,696 |
FY 2009 |
West Virginia TIP Project Revisions |
Project # |
Project Description |
Revision |
Mid-Ohio Valley Transit Authority Intermodal Facility |
Install Elevator |
Project originally scheduled for FY 2009. MOVTA is no longer doing the project, therefore the project is being deleted from the TIP. |
The following amendments were made to the 2008-2011 Transportation Improvement Program at the December 17, 2008 meeting of the WWW Board.
West Virginia New TIP Projects (Amendments) |
|
|
|
|
S354-WET/LA-1
STP-002(453)D |
Wetland Acquisition (McPherson Property) |
$125,000 |
FY 2009 |
S354-WILL/LI-2
NRT-2007(116)D |
Williamstown–wetland walking trail. |
$50,000 |
FY 2009 |
T654-D-0.01
BR-NBIS(372)D |
US 50–Blennerhasset Island Bridge 6 year inspection. |
$1,500,000 |
FY 2009 |
U35-WIL/LI-3.00
SRTS-2009(057)D |
Williamstown-Construct sidewalk utilizing Safe Routes to School Funds. Dodge Street – from 3rd to W. 5th Street. |
$119,000 |
FY 2009 |
S354-25/13-0.19
BR-2513(001)D |
Bridge replacement on CR 25/13 (Road Fork Br.) 0.05 miles North of Jackson CR 2/1-0.13 mile north of Jackson CR 2/1. |
$400,000 |
FY 2009 |
S354-2/22-0.02
BR– 0222(025)D |
Bridge replacement on CR 2/22 (Hogland Br.) 0.04 miles south Of CR 2/20-intersection of CR 2/22 and CR 2. |
$275,000 |
FY 2009 |
U354-PKR/KE-10
TEA-OH22(001)D |
WV 14 (5th Street) Streetscaping improvement including sidewalk and lighting from Market Street to Belpre Bridge. |
375,000 |
FY 2009 |
West Virginia TIP Project Revisions |
Project # |
Project Description |
Revision |
U354-14-13.57
CMAQ-0014(105)E |
WV and Green Street-Construct dual right turn lanes. |
Include right-of-way phase into the existing project in FY 09
Move construction phase from FY 08 to FY 09
Increased from $655,000 to $1,100,000 |
U354-2-23.11 (03)
NH-0002(384)D |
WV2-Reconstruct to 5 lanes from CR16/3 to CR3/8. |
Increase cost from $8,456,000 to $9,132,000
Construction moved from FY 09 to FY 11 |
U354-14-7.47
STP-0014(090)D
STP-0014(067)D |
WV 14-Upgrade to 4 lanes from north ramp of I-77 interchange to 0.3 miles east of CR 14/1. |
Increase cost from $9,190,000 to $9,830,000
Right-of-Way moved from FY 2008 to FY 2009
Construction moved from FY 2009 to FY 2011 |
U354-14-8.69
STP-0014(113)D |
WV 14-Pettyville-4 lane upgrade. |
Decrease cost from $8,950,000 to $8,635,000
Right-of-way moved from FY 2008 to FY 2010
Construction moved from FY 2009 to FY 2011 |
U354-77-173.22
IM-0773(273)D |
Replace deck and widen to 6 lanes on I-77 Interchange Bridge over WV 95/ Camden Avenue. |
Increase construction cost from $2,876,000 to $3,199,000
Construction moved from FY 2009 to FY 2010 |
S354-50-13.50 00
NH-0050(260)D |
US 50–Resurfacing from 0.22 miles west of CR 50/35 to 2.10 miles east of CR 5. |
Increase cost from $1,488,240 to $2,591,000
Construction moved from FY 08 to FY 09 |
S354-77-173.72
IM-0773(257)
NH-0773(361) |
I-77-Safety upgrade and widening from .7 miles south of WV 47 to the north end of WV 47 Bridge. |
Increase cost from $19,509,000 to $19,559,000
Right-of-Way being moved from FY 2008 to FY 2010
Construction being moved from FY 2009 to FY 2010 |
Ohio New TIP Projects (Amendments) |
|
|
|
|
PID 83919
WAS-Marietta River Trail- (Phase 3) |
Marietta -River Trail Phase 3 extension. Beginning at 4th Street near Ohio River and ending on the north side of Duck Creek. Includes construction of bridge over Duck Creek. |
$1,190,500 |
FY 2011 |
PID 83805
WAS-SR7–39.23 |
Landslide repair begin 0.34 miles south of CR 244. |
$699,050 |
FY 2011 |
PID 84447
WAS-SR60-6.610 |
SR 60-Two lane resurfacing using an asphalt overlay treatment. Beginning 0.20 miles north of TR 337 ( Brooks Rd.). |
$1,040,000 |
FY 2009 |
PID 84189
WAS-SR124–3.336 |
SR 124 – Culvert liner project 0.03 miles south of TR 298. |
$533,000 |
FY 2011 |
PID 83389
WAS-SR7-23.050 |
Intersection Improvement at Pike (SR 7), Green and 7th St. intersection in Marietta. Safety Project. |
$3,723,986 |
FY 2010 (RW) |
PID 84762
WAS-D10-SRTS |
Development of School Travel Plans for various communities throughout the District including Belpre, Marietta and Little Hocking. |
$13,000 |
FY 2009 (Study) |
PID 84854
WAS-SR7-24.97 |
Total concrete pavement replacement on SR 7 at the I-77 Interchange. Begin at SR 7 and I-77 interchange. |
$4,347,000 |
FY 2010 |
PID 75653
NOB-IR77-4.080 |
Bridge painting project. Includes NOB-77-4.000 LT and RT, NOB-77-16.80 LT and RT, NOB-77-7.35 and WAS-77-2.80. |
$2,559,000 |
FY 2009 |
PID 77971
MOE-SR7-2.210 |
Two-lane resurfacing project using a chipseal interlayer and an asphalt overlay. MOE-7-2.21-8.45, MOE-7-21.13-22.73, WAS-7-37.31-39.12, 49.53-51.43 and WAS-26-20.99-21.99. |
$1,800,900 |
FY 2009 |
PID 85197
WAS-SR7-19.350 |
Repair damage at overlook (rest area) at WAS-7-19.35 location. Damaged caused by car accident. |
$31,200 |
FY 2009 |
PID 85028
WAS-SR7-22.750 |
Signal timing and coordination improvements along WAS-SR7-22.75-24.96 corridor (Pike Street). PE phase only. |
$38,884 |
FY 2009 |
PID 85040
WAS-CR25-0.00 |
Two-lane resurfacing project on CR25. Begin at SR7 and end at CR 244. |
$182,000 |
FY 2011 |
PID 83819
WAS-SR 26-0.420 |
Two-lane resurfacing project using asphalt overlay. WAS-26-0.42-2.03, 2.44-2.46 and WAS 821-4.43-11.78. |
$1,997,400 |
FY 2010 |
PID 22527
WAS-US50-3.54 |
Four lane resurfacing project using a double microsurfacing treatment. WAS 50-3.54-7.19 includes WAS 618 0.00-1.39. |
$1,075,760 |
FY 2010 |
PID 83212
WAS-SR 550-17.610 |
Slide repair on SR 550 0.25 miles east of TR 125. (Fix No. 2). |
$243,415 |
FY 2010 |
| Ohio TIP Project Revisions |
Project # |
Project Description |
Revision |
PID 25092|
WAS-SR7-20.31 |
Bridge replacement project. Begin 0.12 miles north of TR 7. |
Project moved from FY 2010 to FY 2011 |
PID 77646
WAS-SR7-39.79 |
Culvert liner project. Begin 0.18 miles south of CR 244. |
Project moved from FY 2009 to FY 2011 |
PID 77619
WAS-SR 26-12.52 |
Bridge painting project. Begin 0.01 miles north of CR 12. |
Project moved from FY 2011 to FY 2012 |
PID 75693
WAS-SR 618-2.30 |
Culvert liner-west of intersection with entrance to Kraton Chemical Co. |
Project moved from FY 2010 to FY 2011 |
PID 19624
WAS-SR 821–0.00 |
Minor realignment work to include pavement, guardrails, embankment, and culverts. Begin at SR 60. |
Project moved from FY 2011 to FY 2014 |
PID 83259
WAS-CR9-4.91 |
Full depth pavement restoration, guardrail and pavement marking. CR 9-8.55-10.89. |
Remove from TIP (outside MPO area) |
PID 77617
WAS-I-77-0.3 |
Sealing of splash zones on various bridges. |
Project cancelled |
PID 80843
WAS-US 50-1.97 LT & RT |
Bridge painting project on US 50. |
Project moved from FY 2008 to FY 2010 |
| Ohio TIP Project Added For Informational Purposes Only |
Project # |
Project Description |
Total Project Cost |
Schedule |
PID 83389
WAS-SR7–23.05 |
Intersection Improvement at Pike (SR7), Green and 7th Street intersection in Marietta. Safety project. |
$3,723,986 |
FY 2012 |
PID 83787
D10-Pavement Markings |
District 10 – Pavement marking project at various locations. |
$1,843,000 |
FY 2013 |
PID 83788
D10-HS |
District 10 – Herbicidal Spraying contract on various routes. |
$100,000 |
FY 2013 |
PID 84200
D10-Fence |
District 10 – Construction and replacement of fencing parallel to various priority routes. |
$780,000 |
FY 2013 |
PID 22512
WAS-SR7-14.06 |
SR 7 – Four lane resurfacing from 14.06 to 17.60. Begin 0.17 miles south of CR 3. |
$1,994,000 |
FY 2012 |
PID 84164
WAS-SR7-20.39 |
Bridge painting project. Includes WAS-SR7-20.39 and WAS-I-77-09.19. |
$3,112,560 |
FY 2015 |
PID 83708
WAS-IR77-0.060 |
I-77 – Four lane resurfacing project using a double microsurfacing treatment. Beginning 0.24 miles south of SR 7. |
$1,689,600 |
FY 2015 |
PID 83709
WAS-SR7-17.60 |
SR 7 – Resurfacing project using a double microsurfacing treatment. Includes WAS-SR7-17.60-20.27 and 31.75-33.07. |
$828,900 |
FY 2014 |
PID 84201
D10-GR |
District 10 – Guardrail upgrade/replacement on various routes. |
$574,000 |
FY 2014 |
PID 84204
D10-HS |
District 10 – Herbicidal spraying at various locations. |
$104,000 |
FY 2014 |
PID 84206
D10-MOW |
District 10 – Two year mowing contract beginning in FY 2014. |
$260,000 |
FY 2014 |
PID 84207
D10-Pavement Markings |
District 10 – Pavement marking project at various locations. |
$1,976,000 |
FY 2014 |
PID 84208
D10-RPM |
Raised pavement marker contract for various routes. |
$383,000 |
FY 2014 |
PID 85029
WAS-Marietta Armory-OH 2007-05 |
Rehabilitation of the Marietta Armory Welcome Center on Front Street using Federal Scenic Byway funds. |
$253,397 |
FY 2015 |
The following amendments are available for public review..
West Virginia New TIP Projects (Amendments) |
|
|
|
|
U354-14-13.57
CMAQ-0014(105)E |
WV 14 and Green Street – Construct dual right turn lanes. |
Increased from $655,000 to $800,000 |
Include right-of-way phase to existing project in FY 2008.
|
S354-WET/LA-1
STP-0002(453)D |
Wetland Acquisition (McPherson Property) |
$125,000 |
FY 2008 |
U354-WIL/LI-2
NRT-2007(116)D |
Williamstown-wetland walking trail. |
$50,000 |
FY 2008 |
U354-2-23.11 03
NH-0002(384)D |
WV 2 – Reconstruct to 5 lanes from CR 16/3 to CR 3/8. |
Increase from $8,456,000 to $9,132,000 |
Construction moved from FY 2009 to FY 2011. |
U354-14-7.47
STP-0014 (090)D
STP-0014 (067)D |
WV 14 – Upgrade to 4 lanes from north ramp of I-77 interchange to 0.3 miles east of CR 14/1. |
Increase from $9,190,000 to $9,830,000 |
Right-of-Way moved from FY 2008 to FY 2009 Construction moved from FY 2009 to FY 2011 |
U354-14-8.69
STP-0014 (113)D |
WV14 – Pettyville – 4 lane upgrade |
Decreased from $8,950,000 to $8,635,000 |
Right-of-Way moved from FY 2008 to FY 2010 Construction moved from FY 2009 to FY 2011 |
S354-77-173.22
IM-0773 (273)D |
Replace deck and widen to 6 lanes on I-77 interchange bridge over WV 95/ Camden Avenue. |
Increase from $2,876,000 to $3,199,000 |
Construction moved from FY 2009 to FY 2010 |
West Virginia TIP Project Revisions |
Project # |
Project Description |
Revision |
U354-95-4.84
NHG-0095(068)D |
Signal Renovation at intersection of Camden Ave. and Broadway Ave. |
Cost increase from $385,632 to $422,168. |
S354-50-13.50 00
NH-0050(260)D |
US50 – Resurfacing from 0.22 miles west of CR 50/35 to 2.10 miles east of CR5. |
Cost increase from $1,488,240 to $2,800,000.
|
S354-77-173.72
IM-0773 (257)
NH-0773 (361) |
I-77 – Safety upgrade and widening from .7 miles south of WV 47 to the north end of WV 47 bridge. |
Cost increase from $19,509,000 to $19,559,000. Project being moved from FY 2009 to FY 2010.
|
Ohio New TIP Projects (Amendments) |
|
|
|
|
PID 83919
WAS-Marietta River Trail (Phase 3) |
Extension of Marietta River Trail Bike/Pedestrian path, approximately 1.3 miles and includes construction of Bridge over Duck Creek. Begins at 4 th Street near Ohio River and ending on north side of Duck Creek.
|
$1,190,500 |
FY 2010 |
PID 83805
WAS-SR7-39.33 |
Landslide repair. Beginning at 0.34 miles south of CR 244.
|
$699,050 |
FY 2011 |
| Ohio TIP Project Added For Informational Purposes Only |
Project # |
Project Description |
Total Project Cost |
Schedule |
PID 83787
PID Pavement Marking |
Pavement marking project. |
$1,843,000 |
FY 2013 |
PID 83788
D 10 - HS |
Herbicidal spraying on various routes and sections in District 10. |
$100,000 |
FY 2013 |
The following amendments were made to the 2008-2011 Transportation Improvement Program at the December 21, 2007 meeting of the WWW Board.
Ohio New TIP Projects (Amendments) |
|
|
|
|
PID 83384
WAS-Marietta-LED Signal |
Multi-Intersection traffic signal upgrade to LED system. Includes 36 different intersections. Five locations will include battery backup units. Signals along SR7 will have back plates installed.
|
$250,000 |
FY 2009 |
PID 83389
WAS-SR 7-23.05 |
Intersection improvement at Pike (SR7), Green and 7th Street in Marietta..
|
|
FY 2012
(beyond current TIP period, shown for information in outer year)
|
Statewide Line Item |
Diesel Emission Reduction Program |
|
|
Ohio TIP Project Revisions |
Project # |
Project Description |
Revision |
PID 81309
WAS-SR 7-10.20 |
Four lane preventative maintenance micro-surfacing project. Begin 0.09 miles north of TR 358 ( Lockhart Rd.) |
Project moved from Fiscal Year 09 to Fiscal Year 08.
|
PID 81432
WAS-SR 7-28.20 |
Two lane resurfacing project. WAS 7-28.20-31.75, WAS 550 0.00-10.59 and WAS 676 10.52-17.07. Begin 0.14 miles north of the North Kardex entrance. |
Project moved from Fiscal Year 08 to Fiscal Year 09. |
PID 80257
WAS-SR 7-35.85 |
Asphalt bridge deck overlay. Begin 0.38 miles north of TR 433. |
Remove from TIP (project cancelled). |
PID 81479
WAS-SR 7-49.53 |
Two lane resurfacing project. WAS 7 49.53-51.43 and WAS 60 6.61-10.28 asphalt overlay with repairs. WAS 26 20.99-21.99, WAS 145 0.00-3.29 and WAS 260 0.30-11.00 use chip and seal treatment. |
Remove from TIP (job modified no longer includes segment inside MPO boundary). |
PID 75859
WAS-SR 676-24.13 |
Drainage work on Lancaster St. (Harmar Hill) in Marietta. Begin at Barlett St. and end at SR7. |
Cost increase from $277,000 to $442,784 (MPO portion increased to $280,471). |
PID 83255
WAS-CR 10-00.00 |
Construction, Warren Township-Repair joints and base concrete, resurface with asphalt, apply pavement markings. |
Remove from TIP. Project ineligible for federal funds. |
PID 83253
WAS-CR 51-00.00 |
Belpre and Dunham Townships-Repair joints and base concrete, resurface with asphalt, apply pavement markings. |
Remove from TIP. Project ineligible for federal funds. |
The following amendments were made to the 2008-2011 Transportation Improvement Program at the September 21, 2007 meeting of the WWW Board.
West Virginia New TIP Projects (Amendments) |
|
|
|
|
U354-2-23.11 02
EB-002(438) |
WV2-Bridge over I-77 0.16 miles north of CR 4/6. Replace and widen bridge and approach. |
Changed from $8,213,000 to $9,199,000. Federal share of construction phase changed from $6,670,000 to $7,358,000. |
Project remains in FY 2010 |
U354-14-11.08 00
CMAQ-0014 (108) E
CMAQ-0014 (109) E
CMAQ-0014 (110) E |
WV14/Gihon Rd. - Intersection improvements including the construction of a right turn lane from 500’ south of Gihon Rd. to 500’ north Gihon Rd. |
Changed from $900,000 to $951,000. Federal share of construction phase changed from $300,000 to $400,000. |
Engineering phase moved from FY 2009 to FY 2008
Construction phase moved from FY2010 to FY 2009 |
U354-14-13.57
CMAQ-0014 (105) E |
WV14 and Green Street – 400’ west of 5 th St. to 400’ south of Green Street – Dual right turn lanes. |
Changed from $595,000 to $655,000. Federal share of construction phase changed from $468,000 to $516,000. |
Project remains in FY 2008 |
U354-14-15.19 00
NHG-0014 (107) E |
Sign renovation project from the intersection of WV14 and WV68 to the intersection of WV14 and CR 21/39 in Vienna. |
Changed from $400,000 to $428,000. Federal share of construction phase changed from $400,000 to $428,000. |
Project remains in FY 2008 |
S354-32-0.40
BR-0032 (024) E |
Wood CR 32 – Replace Sundowner Bridge over Neal Run, 0.05 miles west of CR 32/3. |
Changed from $1,318,000 to $1,404,000. Federal share of construction phase changed from $1,040,000 to $1,123,000. |
Right-of-way phase deleted
Construction phase remains in FY 2009 |
X354-D-0.63 06
APD-0282 (143) E |
River Hill Road Bridge – Construct bridge from 0.13 miles north of Corridor D to 0.15 miles north of Corridor D. |
Changed from $5,196,000 to $5,533,000. Federal share of construction phase changed from $4,252,000 to $4,266,000. |
Project remains in Fiscal Year 2008 |
U354-47-2.75 00
STPG-0047 (045) E |
New signal at the WV 47/I-77 SB exit/entrance ramp. Modification of the WB exit/entrance ramp. |
Changed from $280,000 to $300,000. Federal share of construction phase changed from $280,000 to $300,000. |
Project remains in FY 2008 |
S354-50-3.43
BR-0050 (147) E |
Renovate Winans Arch culverts at Worthington Cr. 0.3 miles east of CR 50/44. |
Changed from $385,000 to $464,000. Federal share of construction phase changed from $280,000 to $351,000. |
Contract plans remain in Fiscal Year 2008
Construction remains in Fiscal Year 2011 |
U354-50 - 4.83 00
NHG – 0050 (271) E
NHG – 0050 (272) E |
US 50 – Sign renovation, various locations. |
Changed from $1,250,000 to $1,071,000. Federal share of construction phase changed from $1,000,000 to $1,071,000. |
Construction phase moved from Fiscal Year 2008 to Fiscal Year 2010 |
S354-50-9.44 00
NH-0050 (259) E |
US 50 – Resurface (1.5”) from CR 50/37 to 0.22 miles west to CR 50/35. Includes guardrails. |
Changed from $1,275,000 to $1,568,000. Federal share of construction phase changed from $1,020,000 to $1,254,000. |
Construction phase remains in Fiscal Year 2011 |
S354-50-13.50 00
NH-0050 (260) E |
US 50 – Resurface (1.5”) from 0.22 miles west of CR 50/35 to 2.10 miles east of CR 5. |
Changed from $1,350,000 to $1,488,000. Federal share of construction phase changed from $1,080,000 to $1,191,000. |
Construction phase remains in Fiscal Year 2008 |
U354-68-1.66
CMAQ-0068 (127) E |
WV 68 and Ann Street – Addition of right turn lane. |
Changed from $225,000 to $247,000. Federal share of construction phase changed from $174,000 to $191,000. |
Engineering and construction phase remain in Fiscal Year 2008 |
U354 – 68 – 19.96
CMAQ – 0068 – (129) E
CMAQ – 0068 – (130) E
CMAQ – 0068 – (131) E |
WV 68 – Emerson Ave./36 th Street intersection realignment. Includes signal renovation and construction of turn lane on 36 th St.. |
Changed from $650,000 to $691,000. Federal share of construction phase changed from $228,000 to $261,000. |
Engineering phase moved from Fiscal Year 2009 to Fiscal Year 2008. Right-of-way phase remains in Fiscal Year 2009. Construction phase moved from Fiscal Year 2010 to Fiscal Year 2009. |
S318 - 0 77 – 144.00
IMG – 0773 (378) E |
I-77 sign renovation project from Ravenswood interchange to Ohio State line. |
$1,000,000 |
Construction phase moved from Fiscal Year 2008 to Fiscal Year 2010 |
S354-77-157.00 00
IM-0773 (392) E |
I-77 – Resurface (1.5”) from Jackson Co. line to CR 21/31 overpass. Includes removing overlay, paving shoulders, and guardrails. |
Changed from $1,150,000 to $1,365,000. Federal share of construction cost changed from $1,035,000 to $1,229,000. |
Construction phase moved from Fiscal Year 2010 to Fiscal Year 2011 |
S354-77-160.34
IM-0773 (389) E |
I-77 – Resurface (1.5”) remove overlay, pave shoulders, guardrails from CR 21/31 overpass to CR 21/24 overpass. |
Changed from $1,700,000 to $2,090,000. Federal share of construction phase changed from $1,530,000 to $1,881,000. |
Construction phase moved from Fiscal Year 2011 to Fiscal Year 2012 |
S354-77-181.93 00
IM-0773 (390) E |
I-77 NB – Resurface (1.5”) from 1.87 miles north of WV2 interchange to the Ohio River Bridge. Includes removing overlay, paving shoulders and guardrails. |
Changed from $1,350,000 to $1,603,000. Federal share of construction phase changed from $1,215,000 to $1,442,000. |
Construction phase moved from Fiscal Year 2010 to Fiscal Year 2011 |
S354-77-173.72
IM-0773 (257)
NH – 0073 (361) |
Widen I-77 to 6 lanes including two bridges from .7 miles south of WV 47 to the north end of WV 47 bridge ( Staunton Avenue interchange – safety upgrade). |
Changed from $17,588,000 to $19,509,000. Federal share of construction phase changed from $15,196,000 to $16,904,000. |
Right-of-way remains in Fiscal Year 2008.
onstruction remains in Fiscal Year 2009.
|
T654-77-186.79 00
BR-NBIS (356) E |
Williamstown/Marietta Br. Over Ohio River. 6 year inspection. |
$480,000 |
Project moved from Fiscal Year 2009 to 2008 |
U354-95-4.84
NHG-0095 (068) E |
Intersection of Camden Avenue and Broadway Avenue – Signal renovation project. |
Changed from $360,000 to $386,000. Federal share of construction phase changed from $360,000 to $386,000. |
Construction phase remains in Fiscal Year 2008 |
West Virginia TIP Project Revisions |
Project # |
Project Description |
Revision |
S354-14-18.34 00
NH-0014 (101) E |
WV 14 – Grand Central Avenue – Resurface (1”) from 0.74 miles south of CR 12 to 0.18 miles south of CR 21/4. |
Deleted |
S354-47-8.22 00
STP-0047 (041) E |
WV 47 – Resurface (1”) from 1.19 miles east of CR 47/17 to CR 47/10. |
Deleted |
S354-50-5.67 00
NH – 0050 (249) E |
US 50 – Resurface (1.5”) beginning milepost 5.67 to 0.9 miles west of CR 50/4. Project includes guardrails. |
Deleted |
S354-68-0.00 00
STP-0068 (124) E |
WV 68 – Resurface (1”) from Jackson Co. line to CR 2/2. |
Deleted |
354-68-19.06 00
NH-0068 (122) E |
WV 68/ - Emerson Avenue – Resurface (1”) rotomill from WV 14 to 0.03 miles south of CR 2/7. |
Deleted |
S354-95-3.40 00
NH – 0095 (067) E |
WV 95 – Camden Avenue – Resurface (1”) from WV 14 to CR 21/16. |
Deleted |
Ohio New TIP Projects (Amendments) |
|
|
|
|
PID 82958
WAS-Marietta Detour Study |
Marietta : Traffic operations study in preparation for Washington Street Bridge closure. |
$37,300 |
FY 2008 |
PID 82996
WAS-50-01.97 LT |
Belpre Township : Concrete deck overlay. |
$355,900 |
FY 2011 |
PID 83259
WAS-CR9-4.91 |
Newport and Lawrence Townships: Full depth resurfacing, plus guardrail and pavement marking. |
$601,400 |
FY 2009 |
PID 83255
WAS-CR10-00.00 |
Constitution, Warren Township: Repair joints and base concrete, resurfacing with asphalt, apply pavement markings. |
$287,875 |
FY 2011 |
PID 83253
WAS-CR51-00.00 |
Belpre and Dunham Townships: Repair joints and base concrete, resurface with asphalt, apply pavement markings. |
$138,010 |
FY 2011 |
PID 82799
WAS-US50-8.61 |
Construct two left turn lanes at the intersection of WAS SR7 and Braun Rd., add two left turn signal heads. Revise project to include the same improvement at the intersection of SR 7 and Farson St. |
Revised from $359,817 to $719,634. MPO funding to be capped at $575,707. |
FY 2010 |
Ohio TIP Project Revisions |
|
|
|
PID 79105
WAS-SR618-3.80 |
Belpre: Intersection improvement at Farson Street and SR618. Work includes construction of a through lane and possible signal pole relocation. |
Increase MPO funding from $244,000 to $259,659.92. |
|