West Virginia New TIP Projects (Amendments)

Project #

Project Description

Total Project Cost

Schedule

U354-14-13.57
CMAQ-0014(105)E

WV 14 and Green Street – Construct dual right turn lanes.

Increased from $655,000 to $800,000

Include right-of-way phase to existing project in FY 2008.

S354-WET/LA-1
STP-0002(453)D

Wetland Acquisition (McPherson Property)
$125,000
FY 2008

U354-WIL/LI-2
NRT-2007(116)D

Williamstown-wetland walking trail.
$50,000
FY 2008

U354-2-23.11 03
NH-0002(384)D

WV 2 – Reconstruct to 5 lanes from CR 16/3 to CR 3/8.

Increase from $8,456,000 to $9,132,000

Construction moved from FY 2009 to FY 2011.

U354-14-7.47
STP-0014 (090)D
STP-0014 (067)D

WV 14 – Upgrade to 4 lanes from north ramp of I-77 interchange to 0.3 miles east of CR 14/1.

Increase from $9,190,000 to $9,830,000

Right-of-Way moved from FY 2008 to FY 2009 Construction moved from FY 2009 to FY 2011

U354-14-8.69
STP-0014 (113)D

WV14 – Pettyville – 4 lane upgrade
Decreased from $8,950,000 to $8,635,000

Right-of-Way moved from FY 2008 to FY 2010 Construction moved from FY 2009 to FY 2011

S354-77-173.22
IM-0773 (273)D

Replace deck and widen to 6 lanes on I-77 interchange bridge over WV 95/ Camden Avenue.

Increase from $2,876,000 to $3,199,000

Construction moved from FY 2009 to FY 2010

West Virginia TIP Project Revisions

Project #

Project Description

Revision

U354-95-4.84
NHG-0095(068)D

Signal Renovation at intersection of Camden Ave. and Broadway Ave.

Cost increase from $385,632 to $422,168.

S354-50-13.50 00
NH-0050(260)D

US50 – Resurfacing from 0.22 miles west of CR 50/35 to 2.10 miles east of CR5.

Cost increase from $1,488,240 to $2,800,000.

S354-77-173.72
IM-0773 (257)
NH-0773 (361)

I-77 – Safety upgrade and widening from .7 miles south of WV 47 to the north end of WV 47 bridge.

Cost increase from $19,509,000 to $19,559,000. Project being moved from FY 2009 to FY 2010.

Ohio New TIP Projects (Amendments)

Project #

Project Description

Total Project Cost

Schedule

PID 83919
WAS-Marietta River Trail (Phase 3)

Extension of Marietta River Trail Bike/Pedestrian path, approximately 1.3 miles and includes construction of Bridge over Duck Creek. Begins at 4 th Street near Ohio River and ending on north side of Duck Creek.

$1,190,500
FY 2010

PID 83805
WAS-SR7-39.33

Landslide repair. Beginning at 0.34 miles south of CR 244.

$699,050
FY 2011
Ohio TIP Project Added For Informational Purposes Only
Project #
Project Description
Total Project Cost
Schedule
PID 83787
PID Pavement Marking
Pavement marking project.
$1,843,000

FY 2013

PID 83788
D 10 - HS

Herbicidal spraying on various routes and sections in District 10.
$100,000
FY 2013

The following amendments were made to the 2008-2011 Transportation Improvement Program at the December 21, 2007 meeting of the WWW Board.

Ohio New TIP Projects (Amendments)

Project #

Project Description

Total Project Cost

Schedule

PID 83384
WAS-Marietta-LED Signal

Multi-Intersection traffic signal upgrade to LED system. Includes 36 different intersections. Five locations will include battery backup units. Signals along SR7 will have back plates installed.

$250,000
FY 2009

PID 83389
WAS-SR 7-23.05

Intersection improvement at Pike (SR7), Green and 7th Street in Marietta..

$1,468,370

FY 2012
(beyond current TIP period, shown for information in outer year)

Statewide Line Item

Diesel Emission Reduction Program

   

Ohio TIP Project Revisions

Project #

Project Description

Revision

PID 81309
WAS-SR 7-10.20

Four lane preventative maintenance micro-surfacing project. Begin 0.09 miles north of TR 358 ( Lockhart Rd.)

Project moved from Fiscal Year 09 to Fiscal Year 08.

PID 81432
WAS-SR 7-28.20

Two lane resurfacing project. WAS 7-28.20-31.75, WAS 550 0.00-10.59 and WAS 676 10.52-17.07. Begin 0.14 miles north of the North Kardex entrance.

Project moved from Fiscal Year 08 to Fiscal Year 09.

PID 80257
WAS-SR 7-35.85

Asphalt bridge deck overlay. Begin 0.38 miles north of TR 433.

Remove from TIP (project cancelled).

PID 81479
WAS-SR 7-49.53

Two lane resurfacing project. WAS 7 49.53-51.43 and WAS 60 6.61-10.28 asphalt overlay with repairs. WAS 26 20.99-21.99, WAS 145 0.00-3.29 and WAS 260 0.30-11.00 use chip and seal treatment.

Remove from TIP (job modified no longer includes segment inside MPO boundary).

PID 75859
WAS-SR 676-24.13

Drainage work on Lancaster St. (Harmar Hill) in Marietta. Begin at Barlett St. and end at SR7.

Cost increase from $277,000 to $442,784 (MPO portion increased to $280,471).

PID 83255
WAS-CR 10-00.00

Construction, Warren Township-Repair joints and base concrete, resurface with asphalt, apply pavement markings.

Remove from TIP. Project ineligible for federal funds.

PID 83253
WAS-CR 51-00.00

Belpre and Dunham Townships-Repair joints and base concrete, resurface with asphalt, apply pavement markings.

Remove from TIP. Project ineligible for federal funds.

The following amendments were made to the 2008-2011 Transportation Improvement Program at the September 21, 2007 meeting of the WWW Board.

West Virginia New TIP Projects (Amendments)

Project #

Project Description

Total Project Cost

Schedule

U354-2-23.11 02
EB-002(438)

WV2-Bridge over I-77 0.16 miles north of CR 4/6. Replace and widen bridge and approach.

Changed from $8,213,000 to $9,199,000. Federal share of construction phase changed from $6,670,000 to $7,358,000.
Project remains in FY 2010

U354-14-11.08 00
CMAQ-0014 (108) E
CMAQ-0014 (109) E
CMAQ-0014 (110) E

WV14/Gihon Rd. - Intersection improvements including the construction of a right turn lane from 500’ south of Gihon Rd. to 500’ north Gihon Rd.

Changed from $900,000 to $951,000. Federal share of construction phase changed from $300,000 to $400,000.

Engineering phase moved from FY 2009 to FY 2008

Construction phase moved from FY2010 to FY 2009

U354-14-13.57
CMAQ-0014 (105) E

WV14 and Green Street – 400’ west of 5 th St. to 400’ south of Green Street – Dual right turn lanes.

Changed from $595,000 to $655,000. Federal share of construction phase changed from $468,000 to $516,000.
Project remains in FY 2008

U354-14-15.19 00
NHG-0014 (107) E

Sign renovation project from the intersection of WV14 and WV68 to the intersection of WV14 and CR 21/39 in Vienna.

Changed from $400,000 to $428,000. Federal share of construction phase changed from $400,000 to $428,000.
Project remains in FY 2008

S354-32-0.40
BR-0032 (024) E

Wood CR 32 – Replace Sundowner Bridge over Neal Run, 0.05 miles west of CR 32/3.

Changed from $1,318,000 to $1,404,000. Federal share of construction phase changed from $1,040,000 to $1,123,000.

Right-of-way phase deleted

Construction phase remains in FY 2009

X354-D-0.63 06
APD-0282 (143) E

River Hill Road Bridge – Construct bridge from 0.13 miles north of Corridor D to 0.15 miles north of Corridor D.

Changed from $5,196,000 to $5,533,000. Federal share of construction phase changed from $4,252,000 to $4,266,000.
Project remains in Fiscal Year 2008

U354-47-2.75 00
STPG-0047 (045) E

New signal at the WV 47/I-77 SB exit/entrance ramp. Modification of the WB exit/entrance ramp.

Changed from $280,000 to $300,000. Federal share of construction phase changed from $280,000 to $300,000.
Project remains in FY 2008

S354-50-3.43
BR-0050 (147) E

Renovate Winans Arch culverts at Worthington Cr. 0.3 miles east of CR 50/44.
Changed from $385,000 to $464,000. Federal share of construction phase changed from $280,000 to $351,000.

Contract plans remain in Fiscal Year 2008

Construction remains in Fiscal Year 2011

U354-50 - 4.83 00
NHG – 0050 (271) E
NHG – 0050 (272) E

US 50 – Sign renovation, various locations.
Changed from $1,250,000 to $1,071,000. Federal share of construction phase changed from $1,000,000 to $1,071,000.

Construction phase moved from Fiscal Year 2008 to Fiscal Year 2010

S354-50-9.44 00
NH-0050 (259) E

US 50 – Resurface (1.5”) from CR 50/37 to 0.22 miles west to CR 50/35. Includes guardrails.

Changed from $1,275,000 to $1,568,000. Federal share of construction phase changed from $1,020,000 to $1,254,000.
Construction phase remains in Fiscal Year 2011

S354-50-13.50 00
NH-0050 (260) E

US 50 – Resurface (1.5”) from 0.22 miles west of CR 50/35 to 2.10 miles east of CR 5.

Changed from $1,350,000 to $1,488,000. Federal share of construction phase changed from $1,080,000 to $1,191,000.
Construction phase remains in Fiscal Year 2008

U354-68-1.66
CMAQ-0068 (127) E

WV 68 and Ann Street – Addition of right turn lane.
Changed from $225,000 to $247,000. Federal share of construction phase changed from $174,000 to $191,000.
Engineering and construction phase remain in Fiscal Year 2008

U354 – 68 – 19.96
CMAQ – 0068 – (129) E
CMAQ – 0068 – (130) E
CMAQ – 0068 – (131) E

WV 68 – Emerson Ave./36 th Street intersection realignment. Includes signal renovation and construction of turn lane on 36 th St..
Changed from $650,000 to $691,000. Federal share of construction phase changed from $228,000 to $261,000.
Engineering phase moved from Fiscal Year 2009 to Fiscal Year 2008. Right-of-way phase remains in Fiscal Year 2009. Construction phase moved from Fiscal Year 2010 to Fiscal Year 2009.

S318 - 0 77 – 144.00
IMG – 0773 (378) E

I-77 sign renovation project from Ravenswood interchange to Ohio State line.
$1,000,000
Construction phase moved from Fiscal Year 2008 to Fiscal Year 2010

S354-77-157.00 00
IM-0773 (392) E

I-77 – Resurface (1.5”) from Jackson Co. line to CR 21/31 overpass. Includes removing overlay, paving shoulders, and guardrails.

Changed from $1,150,000 to $1,365,000. Federal share of construction cost changed from $1,035,000 to $1,229,000.

Construction phase moved from Fiscal Year 2010 to Fiscal Year 2011

S354-77-160.34
IM-0773 (389) E

I-77 – Resurface (1.5”) remove overlay, pave shoulders, guardrails from CR 21/31 overpass to CR 21/24 overpass.

Changed from $1,700,000 to $2,090,000. Federal share of construction phase changed from $1,530,000 to $1,881,000.

Construction phase moved from Fiscal Year 2011 to Fiscal Year 2012

S354-77-181.93 00
IM-0773 (390) E

I-77 NB – Resurface (1.5”) from 1.87 miles north of WV2 interchange to the Ohio River Bridge. Includes removing overlay, paving shoulders and guardrails.

Changed from $1,350,000 to $1,603,000. Federal share of construction phase changed from $1,215,000 to $1,442,000.

Construction phase moved from Fiscal Year 2010 to Fiscal Year 2011

S354-77-173.72
IM-0773 (257)
NH – 0073 (361)

Widen I-77 to 6 lanes including two bridges from .7 miles south of WV 47 to the north end of WV 47 bridge ( Staunton Avenue interchange – safety upgrade).

Changed from $17,588,000 to $19,509,000. Federal share of construction phase changed from $15,196,000 to $16,904,000.

Right-of-way remains in Fiscal Year 2008.

onstruction remains in Fiscal Year 2009.

T654-77-186.79 00
BR-NBIS (356) E

Williamstown/Marietta Br. Over Ohio River. 6 year inspection.
$480,000
Project moved from Fiscal Year 2009 to 2008

U354-95-4.84
NHG-0095 (068) E

Intersection of Camden Avenue and Broadway Avenue – Signal renovation project.

Changed from $360,000 to $386,000. Federal share of construction phase changed from $360,000 to $386,000.

Construction phase remains in Fiscal Year 2008

West Virginia TIP Project Revisions

Project #

Project Description

Revision

S354-14-18.34 00
NH-0014 (101) E

WV 14 – Grand Central Avenue – Resurface (1”) from 0.74 miles south of CR 12 to 0.18 miles south of CR 21/4.

Deleted

S354-47-8.22 00
STP-0047 (041) E

WV 47 – Resurface (1”) from 1.19 miles east of CR 47/17 to CR 47/10.

Deleted

S354-50-5.67 00
NH – 0050 (249) E

US 50 – Resurface (1.5”) beginning milepost 5.67 to 0.9 miles west of CR 50/4. Project includes guardrails.

Deleted

S354-68-0.00 00
STP-0068 (124) E

WV 68 – Resurface (1”) from Jackson Co. line to CR 2/2.

Deleted

354-68-19.06 00
NH-0068 (122) E

WV 68/ - Emerson Avenue – Resurface (1”) rotomill from WV 14 to 0.03 miles south of CR 2/7.

Deleted

S354-95-3.40 00
NH – 0095 (067) E

WV 95 – Camden Avenue – Resurface (1”) from WV 14 to CR 21/16.

Deleted

Ohio New TIP Projects (Amendments)

Project #

Project Description

Total Project Cost

Schedule

PID 82958
WAS-Marietta Detour Study

Marietta : Traffic operations study in preparation for Washington Street Bridge closure.
$37,300
FY 2008

PID 82996
WAS-50-01.97 LT

Belpre Township : Concrete deck overlay.
$355,900
FY 2011

PID 83259
WAS-CR9-4.91

Newport and Lawrence Townships: Full depth resurfacing, plus guardrail and pavement marking.

$601,400
FY 2009

PID 83255
WAS-CR10-00.00

Constitution, Warren Township: Repair joints and base concrete, resurfacing with asphalt, apply pavement markings.

$287,875
FY 2011

PID 83253
WAS-CR51-00.00

Belpre and Dunham Townships: Repair joints and base concrete, resurface with asphalt, apply pavement markings.
$138,010
FY 2011

PID 82799
WAS-US50-8.61

Construct two left turn lanes at the intersection of WAS SR7 and Braun Rd., add two left turn signal heads. Revise project to include the same improvement at the intersection of SR 7 and Farson St.

Revised from $359,817 to $719,634. MPO funding to be capped at $575,707.

FY 2010

Ohio TIP Project Revisions

Project #

Project Description

Revision

PID 79105
WAS-SR618-3.80

Belpre: Intersection improvement at Farson Street and SR618. Work includes construction of a through lane and possible signal pole relocation.

Increase MPO funding from $244,000 to $259,659.92.

 