February 25 , 2010 | Jamuary 12, 2010 | December 22 , 2009 | September 24, 2009 | April 17, 2009 | April 3, 2009 | March 23, 2009 | February 2, 2009 | December 17, 2008 | March 28, 2008 | December 21, 2007 | September 21, 2007

The following amendments to the 2008-2011 Transportation Improvement Program will be made following a phone vote of the WWW Board on February 25, 2010.

Ohio New TIP Projects (Amendments)

Project #

Project Description

Total Project Cost

Schedule

PID 87861
D10 – Park and Ride

Construct Park and Ride at Little Hocking US 50/SR 124 location.

$2,500,000

FY 2010

PID 87887
D10-Sign

Extrusheet sign replacement project. District-wide.
$700,000
FY 2010

PID 87952
LED/Backplates

Upgrade signals with LED lighting and utilize backplates at various locations in District 10.
$55,000
FY 2010

PID 87950
D10-Rumble Stripes

Rumble strip project on various routes and sections District-wide.
$700,000
FY 2010

PID 19624
WAS-SR821-0.23

Minor realignment, work to include pavement, guardrail, embankment and culverts.

$2,050,000
FY 2010

The following amendments to the 2008-2011 Transportation Improvement Program were made following a meeting of the WWW Board on December 22, 2009.

Ohio New TIP Projects (Amendments)

Project #

Project Description

Total Project Cost

Schedule

PID 87563
WAS-US 50-5.68

US 50: Slide repair beginning 0.04 miles west of SR 618 overpass. Programmed for PE only

$14,360
FY 2010

PID 87590
WAS-CR 9-4.92

CR 9: Two-lane resurfacing project. Begin at CR 46 ( Bells Run Road) and end at CR 544 ( Zion Ridge Road). Work includes new guardrail, pavement marking, and berm conditioning.
$581,000
FY 2012

PID 87789
WAS-SR7-21.76

Intersection study in the City of Marietta from the recent Washington Street Bridge rehabilitation project limits, east to the Third and Washington Street intersection.

$30,000
FY 2011

Ohio TIP Project Revisions

Project #

Project Description

Revision

PID 83389
WAS-SR 7-23.74

Marietta : Intersection improvement at Pike and Acme Street.

Add engineering phase in FY 2010 utilizing MPO CMAQ funds ($100,000). Change the amount of MPO CMAQ funds for construction from $525,000 to $425,000. Construction remains in FY 2012.

PID 86863
WAS-SR 7-22.97

Marietta – Intersection improvement project at Pike, Green, and Seventh Street.

Add Engineering phase in FY 2011 utilizing MPO CMAQ funds ($160,000). Change the amount of MPO CMAQ funds for construction from $494,208 to $334,208. Construction remains in FY 2013.

The following amendments to the 2008-2011 Transportation Improvement Program were made following a meeting of the WWW Board on December 22, 2009.

Ohio New TIP Projects (Amendments)

Project #

Project Description

Total Project Cost

Schedule

PID 79198|
District 10 – Bridge Painting

District 10: District wide bridge painting project.

$2,985,000
FY 2011
PID 85029

Rehabilitation of the Marietta Armory Welcome Center on Front Street.

$315,496
FY 2010
PID 87748

CR 79 – Begins at TR 32-two-lane resurfacing project. Work includes pavement markings.

$635,000
FY 2011

Ohio TIP Project Revisions

Project #

Project Description

Revision

PID 85965

Traffic signal and intersection improvements at Putnam Street, Seventh Street and Glendale Road.

 

Change in MPO funding type from CMAQ to STP.

 

PID 82799

Improvements at the intersection of SR7 with Braun Road and Farson Street in Belpre.

Move project from FY 2011 to FY 2012. Total project cost decreased from $765,000 to $541,331. MPO funding changed from CMAQ to STP ($164,780). The project was also revised to include safety funds ($326,551) and City funds ($50,000).

PID 86863

Marietta-intersection improvements at Pike, Green and 7th Street.

Total project increased from $2,706,000 to $3,333,000. The project cost included the addition of MPO CMAQ funds ($494,208) and local funds ($124,000).

PID 83389

Marietta-Intersection improvement at Pike (SR7) and Acme Streets.

Total Project Cost increased from $2,234,000 to $2,434,000. Project cost modified to include Right-of-Way phase ($200,000).

The following amendments to the 2008-2011 Transportation Improvement Program were made following a phone poll of the WWW Board on September 24, 2009.

Ohio New TIP Projects (Amendments)

Project #

Project Description

Total Project Cost

Schedule

PID 79198|
District 10 – Bridge Painting

District 10: District wide bridge painting project.

$2,985,000
FY 2011

Ohio TIP Project Revisions

Project #

Project Description

Revision

PID 85965
WAS-Putnam/7th Street/Glendale

Marietta-Traffic signal and intersection improvements at Putnam St., Seventh St., and Glendale Road. Project consists of replacing existing strain poles, span wire, vehicular and pedestrian signal heads and signal controller. Signal timing and phasing will also be optimized to improve traffic flow and reduce delay.

 

Total cost increase from $137,000 to $143,000. MPO portion increased from $110,250 to $114,460.

 

PID 85040
WAS-CR25-0.00

Two-lane resurfacing project on CR 25. Begin at SR7 and end at CR 244.

Total project cost increase from $182,000 to $188,000. MPO portion increased from $144,800 to $149,600.

The following amendments to the 2008-2011 Transportation Improvement Program will be made following a phone poll of the WWW Board on April 17, 2009.

Ohio New TIP Projects (Amendments)

Project #

Project Description

Total Project Cost

Schedule

PID 86302
WAS-Marietta Resurfacing

City of Marietta: Resurface up to 5.21 miles on nine different federal-aid city streets using Economic Stimulus funds.

$1,200,000
FY 2010

PID 22512
WAS-7-14.06

Warren Township : Resurface 3.54 miles of SR7 between mile points 14.06 and 17.60.

$1,994,000
FY 2011

PID 85667
WAS-CR2-Guardrail

Various townships, including Belpre, Durham, Muskingum and Warren: New guardrail on county roads 2, 26, 27, 79, 109 and 805.

$302,000

FY 2010

PID 85954
District 10 signal maintenance.

Maintenance contract funded with all state money.

$742,000
FY 2011

Ohio TIP Project Revisions

Project #

Project Description

Revision

PID 82799|
WAS-50-08.61

 

Belpre: Construct left turn lanes and install left turn signal heads at intersections of SR7/Braun Road and SR7/Farson Street.

 

Cost increase from $720,000 to $765,404, and project moved from FY 2010 to FY 2011.

PID 80843
WAS-50-01.97 LT and RT

Belpre Township : Painting three bridges on US 50 at mile points 1.97 left, 1.97 right and 4.04.

Cost increase from $1,620,000 to $1,998,000, federal funding added to the project, and project moved from FY 2010 to FY 2009.

PID 84447
WAS-60-05.13

Muskingum & Adams Townships: Resurface 2-lane highway with asphalt overlay treatment from Mile point 5.13 to 11.23.

Cost increase from $1,000,000 to $1,102,000.

PID 84854|
WAS-7-24.97

Marietta : Total concrete pavement replacement at 1-77/SR7 interchange.

Cost increased from $4,347,000 to $4,793,000.

PID 75615
WAS-124-03.50

Little Hocking: Replacement of bridge.

Cost decreased from $1,367,000 to $1,196,000.

PID 75693
WAS-618-02.30

Belpre: Line an existing culvert with a culvert.

Cost increased from $379,000 to $457,000. Funding source changed from 100% state to Surface Transportation Program (STP).

PID 77971
MOE-7-02.21

Washington and Monroe counties: Two-lane resurfacing at various locations, including WAS-7-37.31 to 39.12.

Cost decreased from $1,801,000 to $1,639,000.

The following amendments will be made to the 2008-2011 Transportation Improvement Program at the April 3, 2009 meeting of the WWW Board.

Ohio New TIP Projects (Amendments)

Project #

Project Description

Total Project Cost

Schedule

PID 85965

WAS Putnam/7th Street/Glendale Rd.

Maretta - Traffic signal and intersection improvements at Putnam Street, Seventh Street, and Glendale Road. Project consists of replacing existing strain poles, span wire, vehicular and pedestrian signal heads, and signal controller. Signal timing and phasing will also be optimized to improve traffic flow and reduce delay.

$137,000

FY 2011

 

The following amendments to the 2008-2011 Transportation Improvement Program were made following a phone poll of the WWW Board on March 23, 2009.

Ohio New TIP Projects (Amendments)

Project #

Project Description

Total Project Cost

Schedule

PID 85945
WAS-Facility Rehabilitation

Intermodal Facility Accessibility and Enhancement project for the Washington County Community Action Bus Lines.

$1,100,000

FY 2009

PID 85946
WAS-1 Replacement-LTD

Washington County 1 CABL- 1 replacement Light Transit Vehicle for the Washington County Community Action Bus Lines.

$70,000

FY 2009

The following amendments will be to the 2008-2011 Transportation Improvement Program following a phone poll of the WWW Board on February 2, 2009.

West Virginia New TIP Projects (Amendments)

Project #

Project Description

Total Project Cost

Schedule

Mid-Ohio Valley Transit Authority Bus Replacement

Replace 8 buses with 6 low-floor transit buses.

$1,375,696
FY 2009

West Virginia TIP Project Revisions

Project #

Project Description

Revision

Mid-Ohio Valley Transit Authority Intermodal Facility

Install Elevator

Project originally scheduled for FY 2009. MOVTA is no longer doing the project, therefore the project is being deleted from the TIP.

The following amendments were made to the 2008-2011 Transportation Improvement Program at the December 17, 2008 meeting of the WWW Board.

West Virginia New TIP Projects (Amendments)

Project #

Project Description

Total Project Cost

Schedule

S354-WET/LA-1
STP-002(453)D

Wetland Acquisition (McPherson Property)

$125,000
FY 2009

S354-WILL/LI-2
NRT-2007(116)D

Williamstown–wetland walking trail.

$50,000
FY 2009

T654-D-0.01
BR-NBIS(372)D

US 50–Blennerhasset Island Bridge 6 year inspection.

$1,500,000
FY 2009

U35-WIL/LI-3.00
SRTS-2009(057)D

Williamstown-Construct sidewalk utilizing Safe Routes to School Funds. Dodge Street – from 3rd to W. 5th Street.

$119,000
FY 2009

S354-25/13-0.19
BR-2513(001)D

Bridge replacement on CR 25/13 (Road Fork Br.) 0.05 miles North of Jackson CR 2/1-0.13 mile north of Jackson CR 2/1.

$400,000

FY 2009

S354-2/22-0.02
BR– 0222(025)D

Bridge replacement on CR 2/22 (Hogland Br.) 0.04 miles south Of CR 2/20-intersection of CR 2/22 and CR 2.

$275,000
FY 2009
U354-PKR/KE-10
TEA-OH22(001)D
WV 14 (5th Street) Streetscaping improvement including sidewalk and lighting from Market Street to Belpre Bridge.
375,000
FY 2009

West Virginia TIP Project Revisions

Project #

Project Description

Revision

U354-14-13.57
CMAQ-0014(105)E

WV and Green Street-Construct dual right turn lanes.

Include right-of-way phase into the existing project in FY 09
Move construction phase from FY 08 to FY 09
Increased from $655,000 to $1,100,000

U354-2-23.11 (03)
NH-0002(384)D

WV2-Reconstruct to 5 lanes from CR16/3 to CR3/8.

Increase cost from $8,456,000 to $9,132,000
Construction moved from FY 09 to FY 11

U354-14-7.47
STP-0014(090)D
STP-0014(067)D

WV 14-Upgrade to 4 lanes from north ramp of I-77 interchange to 0.3 miles east of CR 14/1.

Increase cost from $9,190,000 to $9,830,000
Right-of-Way moved from FY 2008 to FY 2009
Construction moved from FY 2009 to FY 2011

U354-14-8.69
STP-0014(113)D

WV 14-Pettyville-4 lane upgrade.

Decrease cost from $8,950,000 to $8,635,000
Right-of-way moved from FY 2008 to FY 2010
Construction moved from FY 2009 to FY 2011

U354-77-173.22
IM-0773(273)D

Replace deck and widen to 6 lanes on I-77 Interchange Bridge over WV 95/ Camden Avenue.

Increase construction cost from $2,876,000 to $3,199,000
Construction moved from FY 2009 to FY 2010

S354-50-13.50 00
NH-0050(260)D

US 50–Resurfacing from 0.22 miles west of CR 50/35 to 2.10 miles east of CR 5.

Increase cost from $1,488,240 to $2,591,000
Construction moved from FY 08 to FY 09

S354-77-173.72
IM-0773(257)
NH-0773(361)

I-77-Safety upgrade and widening from .7 miles south of WV 47 to the north end of WV 47 Bridge.

Increase cost from $19,509,000 to $19,559,000
Right-of-Way being moved from FY 2008 to FY 2010
Construction being moved from FY 2009 to FY 2010

Ohio New TIP Projects (Amendments)

Project #

Project Description

Total Project Cost

Schedule

PID 83919
WAS-Marietta River Trail- (Phase 3)

Marietta -River Trail Phase 3 extension. Beginning at 4th Street near Ohio River and ending on the north side of Duck Creek. Includes construction of bridge over Duck Creek.

$1,190,500
FY 2011

PID 83805
WAS-SR7–39.23

Landslide repair begin 0.34 miles south of CR 244.

$699,050

FY 2011

PID 84447
WAS-SR60-6.610

SR 60-Two lane resurfacing using an asphalt overlay treatment. Beginning 0.20 miles north of TR 337 ( Brooks Rd.).
$1,040,000
FY 2009

PID 84189
WAS-SR124–3.336

SR 124 – Culvert liner project 0.03 miles south of TR 298.
$533,000
FY 2011

PID 83389
WAS-SR7-23.050

Intersection Improvement at Pike (SR 7), Green and 7th St. intersection in Marietta. Safety Project.

$3,723,986
FY 2010 (RW)

PID 84762
WAS-D10-SRTS

Development of School Travel Plans for various communities throughout the District including Belpre, Marietta and Little Hocking.
$13,000

FY 2009 (Study)

PID 84854
WAS-SR7-24.97

Total concrete pavement replacement on SR 7 at the I-77 Interchange. Begin at SR 7 and I-77 interchange.

$4,347,000

FY 2010

PID 75653
NOB-IR77-4.080

Bridge painting project. Includes NOB-77-4.000 LT and RT, NOB-77-16.80 LT and RT, NOB-77-7.35 and WAS-77-2.80.

$2,559,000

FY 2009

PID 77971
MOE-SR7-2.210

Two-lane resurfacing project using a chipseal interlayer and an asphalt overlay. MOE-7-2.21-8.45, MOE-7-21.13-22.73, WAS-7-37.31-39.12, 49.53-51.43 and WAS-26-20.99-21.99.

$1,800,900
FY 2009

PID 85197
WAS-SR7-19.350

Repair damage at overlook (rest area) at WAS-7-19.35 location. Damaged caused by car accident.

$31,200
FY 2009

PID 85028
WAS-SR7-22.750

Signal timing and coordination improvements along WAS-SR7-22.75-24.96 corridor (Pike Street). PE phase only.

$38,884
FY 2009

PID 85040
WAS-CR25-0.00

Two-lane resurfacing project on CR25. Begin at SR7 and end at CR 244.

$182,000
FY 2011

PID 83819
WAS-SR 26-0.420

Two-lane resurfacing project using asphalt overlay. WAS-26-0.42-2.03, 2.44-2.46 and WAS 821-4.43-11.78.

$1,997,400

FY 2010

PID 22527
WAS-US50-3.54

Four lane resurfacing project using a double microsurfacing treatment. WAS 50-3.54-7.19 includes WAS 618 0.00-1.39.

$1,075,760
FY 2010

PID 83212
WAS-SR 550-17.610

Slide repair on SR 550 0.25 miles east of TR 125. (Fix No. 2).
$243,415
FY 2010
Ohio TIP Project Revisions

Project #

Project Description

Revision

PID 25092|
WAS-SR7-20.31

Bridge replacement project. Begin 0.12 miles north of TR 7.

Project moved from FY 2010 to FY 2011

PID 77646
WAS-SR7-39.79

Culvert liner project. Begin 0.18 miles south of CR 244.

Project moved from FY 2009 to FY 2011

PID 77619
WAS-SR 26-12.52

Bridge painting project. Begin 0.01 miles north of CR 12.

Project moved from FY 2011 to FY 2012

PID 75693
WAS-SR 618-2.30

Culvert liner-west of intersection with entrance to Kraton Chemical Co.

Project moved from FY 2010 to FY 2011

PID 19624
WAS-SR 821–0.00

Minor realignment work to include pavement, guardrails, embankment, and culverts. Begin at SR 60.

Project moved from FY 2011 to FY 2014

PID 83259
WAS-CR9-4.91

Full depth pavement restoration, guardrail and pavement marking. CR 9-8.55-10.89.

Remove from TIP (outside MPO area)

PID 77617
WAS-I-77-0.3

Sealing of splash zones on various bridges.
Project cancelled

PID 80843
WAS-US 50-1.97 LT & RT

Bridge painting project on US 50.
Project moved from FY 2008 to FY 2010
Ohio TIP Project Added For Informational Purposes Only
Project #
Project Description
Total Project Cost
Schedule

PID 83389
WAS-SR7–23.05

Intersection Improvement at Pike (SR7), Green and 7th Street intersection in Marietta. Safety project.

$3,723,986
FY 2012

PID 83787
D10-Pavement Markings

District 10 – Pavement marking project at various locations.
$1,843,000
FY 2013

PID 83788
D10-HS

District 10 – Herbicidal Spraying contract on various routes.

$100,000

FY 2013

PID 84200
D10-Fence

District 10 – Construction and replacement of fencing parallel to various priority routes.

$780,000
FY 2013

PID 22512
WAS-SR7-14.06

SR 7 – Four lane resurfacing from 14.06 to 17.60. Begin 0.17 miles south of CR 3.
$1,994,000

FY 2012

PID 84164
WAS-SR7-20.39

Bridge painting project. Includes WAS-SR7-20.39 and WAS-I-77-09.19.
$3,112,560

FY 2015

PID 83708
WAS-IR77-0.060

I-77 – Four lane resurfacing project using a double microsurfacing treatment. Beginning 0.24 miles south of SR 7.

$1,689,600

FY 2015

PID 83709
WAS-SR7-17.60

SR 7 – Resurfacing project using a double microsurfacing treatment. Includes WAS-SR7-17.60-20.27 and 31.75-33.07.

$828,900

FY 2014

PID 84201
D10-GR

District 10 – Guardrail upgrade/replacement on various routes.
$574,000
FY 2014

PID 84204
D10-HS

District 10 – Herbicidal spraying at various locations.
$104,000
FY 2014

PID 84206
D10-MOW

District 10 – Two year mowing contract beginning in FY 2014.

$260,000

FY 2014

PID 84207
D10-Pavement Markings

District 10 – Pavement marking project at various locations.
$1,976,000
FY 2014

PID 84208
D10-RPM

Raised pavement marker contract for various routes.

$383,000
FY 2014

PID 85029
WAS-Marietta Armory-OH 2007-05

Rehabilitation of the Marietta Armory Welcome Center on Front Street using Federal Scenic Byway funds.

$253,397
FY 2015

The following amendments are available for public review..

West Virginia New TIP Projects (Amendments)

Project #

Project Description

Total Project Cost

Schedule

U354-14-13.57
CMAQ-0014(105)E

WV 14 and Green Street – Construct dual right turn lanes.

Increased from $655,000 to $800,000

Include right-of-way phase to existing project in FY 2008.

S354-WET/LA-1
STP-0002(453)D

Wetland Acquisition (McPherson Property)
$125,000
FY 2008

U354-WIL/LI-2
NRT-2007(116)D

Williamstown-wetland walking trail.
$50,000
FY 2008

U354-2-23.11 03
NH-0002(384)D

WV 2 – Reconstruct to 5 lanes from CR 16/3 to CR 3/8.

Increase from $8,456,000 to $9,132,000

Construction moved from FY 2009 to FY 2011.

U354-14-7.47
STP-0014 (090)D
STP-0014 (067)D

WV 14 – Upgrade to 4 lanes from north ramp of I-77 interchange to 0.3 miles east of CR 14/1.

Increase from $9,190,000 to $9,830,000

Right-of-Way moved from FY 2008 to FY 2009 Construction moved from FY 2009 to FY 2011

U354-14-8.69
STP-0014 (113)D

WV14 – Pettyville – 4 lane upgrade
Decreased from $8,950,000 to $8,635,000

Right-of-Way moved from FY 2008 to FY 2010 Construction moved from FY 2009 to FY 2011

S354-77-173.22
IM-0773 (273)D

Replace deck and widen to 6 lanes on I-77 interchange bridge over WV 95/ Camden Avenue.

Increase from $2,876,000 to $3,199,000

Construction moved from FY 2009 to FY 2010

West Virginia TIP Project Revisions

Project #

Project Description

Revision

U354-95-4.84
NHG-0095(068)D

Signal Renovation at intersection of Camden Ave. and Broadway Ave.

Cost increase from $385,632 to $422,168.

S354-50-13.50 00
NH-0050(260)D

US50 – Resurfacing from 0.22 miles west of CR 50/35 to 2.10 miles east of CR5.

Cost increase from $1,488,240 to $2,800,000.

S354-77-173.72
IM-0773 (257)
NH-0773 (361)

I-77 – Safety upgrade and widening from .7 miles south of WV 47 to the north end of WV 47 bridge.

Cost increase from $19,509,000 to $19,559,000. Project being moved from FY 2009 to FY 2010.

Ohio New TIP Projects (Amendments)

Project #

Project Description

Total Project Cost

Schedule

PID 83919
WAS-Marietta River Trail (Phase 3)

Extension of Marietta River Trail Bike/Pedestrian path, approximately 1.3 miles and includes construction of Bridge over Duck Creek. Begins at 4 th Street near Ohio River and ending on north side of Duck Creek.

$1,190,500
FY 2010

PID 83805
WAS-SR7-39.33

Landslide repair. Beginning at 0.34 miles south of CR 244.

$699,050
FY 2011
Ohio TIP Project Added For Informational Purposes Only
Project #
Project Description
Total Project Cost
Schedule
PID 83787
PID Pavement Marking
Pavement marking project.
$1,843,000

FY 2013

PID 83788
D 10 - HS

Herbicidal spraying on various routes and sections in District 10.
$100,000
FY 2013

The following amendments were made to the 2008-2011 Transportation Improvement Program at the December 21, 2007 meeting of the WWW Board.

Ohio New TIP Projects (Amendments)

Project #

Project Description

Total Project Cost

Schedule

PID 83384
WAS-Marietta-LED Signal

Multi-Intersection traffic signal upgrade to LED system. Includes 36 different intersections. Five locations will include battery backup units. Signals along SR7 will have back plates installed.

$250,000
FY 2009

PID 83389
WAS-SR 7-23.05

Intersection improvement at Pike (SR7), Green and 7th Street in Marietta..

$1,468,370

FY 2012
(beyond current TIP period, shown for information in outer year)

Statewide Line Item

Diesel Emission Reduction Program

   

Ohio TIP Project Revisions

Project #

Project Description

Revision

PID 81309
WAS-SR 7-10.20

Four lane preventative maintenance micro-surfacing project. Begin 0.09 miles north of TR 358 ( Lockhart Rd.)

Project moved from Fiscal Year 09 to Fiscal Year 08.

PID 81432
WAS-SR 7-28.20

Two lane resurfacing project. WAS 7-28.20-31.75, WAS 550 0.00-10.59 and WAS 676 10.52-17.07. Begin 0.14 miles north of the North Kardex entrance.

Project moved from Fiscal Year 08 to Fiscal Year 09.

PID 80257
WAS-SR 7-35.85

Asphalt bridge deck overlay. Begin 0.38 miles north of TR 433.

Remove from TIP (project cancelled).

PID 81479
WAS-SR 7-49.53

Two lane resurfacing project. WAS 7 49.53-51.43 and WAS 60 6.61-10.28 asphalt overlay with repairs. WAS 26 20.99-21.99, WAS 145 0.00-3.29 and WAS 260 0.30-11.00 use chip and seal treatment.

Remove from TIP (job modified no longer includes segment inside MPO boundary).

PID 75859
WAS-SR 676-24.13

Drainage work on Lancaster St. (Harmar Hill) in Marietta. Begin at Barlett St. and end at SR7.

Cost increase from $277,000 to $442,784 (MPO portion increased to $280,471).

PID 83255
WAS-CR 10-00.00

Construction, Warren Township-Repair joints and base concrete, resurface with asphalt, apply pavement markings.

Remove from TIP. Project ineligible for federal funds.

PID 83253
WAS-CR 51-00.00

Belpre and Dunham Townships-Repair joints and base concrete, resurface with asphalt, apply pavement markings.

Remove from TIP. Project ineligible for federal funds.

The following amendments were made to the 2008-2011 Transportation Improvement Program at the September 21, 2007 meeting of the WWW Board.

West Virginia New TIP Projects (Amendments)

Project #

Project Description

Total Project Cost

Schedule

U354-2-23.11 02
EB-002(438)

WV2-Bridge over I-77 0.16 miles north of CR 4/6. Replace and widen bridge and approach.

Changed from $8,213,000 to $9,199,000. Federal share of construction phase changed from $6,670,000 to $7,358,000.
Project remains in FY 2010

U354-14-11.08 00
CMAQ-0014 (108) E
CMAQ-0014 (109) E
CMAQ-0014 (110) E

WV14/Gihon Rd. - Intersection improvements including the construction of a right turn lane from 500’ south of Gihon Rd. to 500’ north Gihon Rd.

Changed from $900,000 to $951,000. Federal share of construction phase changed from $300,000 to $400,000.

Engineering phase moved from FY 2009 to FY 2008

Construction phase moved from FY2010 to FY 2009

U354-14-13.57
CMAQ-0014 (105) E

WV14 and Green Street – 400’ west of 5 th St. to 400’ south of Green Street – Dual right turn lanes.

Changed from $595,000 to $655,000. Federal share of construction phase changed from $468,000 to $516,000.
Project remains in FY 2008

U354-14-15.19 00
NHG-0014 (107) E

Sign renovation project from the intersection of WV14 and WV68 to the intersection of WV14 and CR 21/39 in Vienna.

Changed from $400,000 to $428,000. Federal share of construction phase changed from $400,000 to $428,000.
Project remains in FY 2008

S354-32-0.40
BR-0032 (024) E

Wood CR 32 – Replace Sundowner Bridge over Neal Run, 0.05 miles west of CR 32/3.

Changed from $1,318,000 to $1,404,000. Federal share of construction phase changed from $1,040,000 to $1,123,000.

Right-of-way phase deleted

Construction phase remains in FY 2009

X354-D-0.63 06
APD-0282 (143) E

River Hill Road Bridge – Construct bridge from 0.13 miles north of Corridor D to 0.15 miles north of Corridor D.

Changed from $5,196,000 to $5,533,000. Federal share of construction phase changed from $4,252,000 to $4,266,000.
Project remains in Fiscal Year 2008

U354-47-2.75 00
STPG-0047 (045) E

New signal at the WV 47/I-77 SB exit/entrance ramp. Modification of the WB exit/entrance ramp.

Changed from $280,000 to $300,000. Federal share of construction phase changed from $280,000 to $300,000.
Project remains in FY 2008

S354-50-3.43
BR-0050 (147) E

Renovate Winans Arch culverts at Worthington Cr. 0.3 miles east of CR 50/44.
Changed from $385,000 to $464,000. Federal share of construction phase changed from $280,000 to $351,000.

Contract plans remain in Fiscal Year 2008

Construction remains in Fiscal Year 2011

U354-50 - 4.83 00
NHG – 0050 (271) E
NHG – 0050 (272) E

US 50 – Sign renovation, various locations.
Changed from $1,250,000 to $1,071,000. Federal share of construction phase changed from $1,000,000 to $1,071,000.

Construction phase moved from Fiscal Year 2008 to Fiscal Year 2010

S354-50-9.44 00
NH-0050 (259) E

US 50 – Resurface (1.5”) from CR 50/37 to 0.22 miles west to CR 50/35. Includes guardrails.

Changed from $1,275,000 to $1,568,000. Federal share of construction phase changed from $1,020,000 to $1,254,000.
Construction phase remains in Fiscal Year 2011

S354-50-13.50 00
NH-0050 (260) E

US 50 – Resurface (1.5”) from 0.22 miles west of CR 50/35 to 2.10 miles east of CR 5.

Changed from $1,350,000 to $1,488,000. Federal share of construction phase changed from $1,080,000 to $1,191,000.
Construction phase remains in Fiscal Year 2008

U354-68-1.66
CMAQ-0068 (127) E

WV 68 and Ann Street – Addition of right turn lane.
Changed from $225,000 to $247,000. Federal share of construction phase changed from $174,000 to $191,000.
Engineering and construction phase remain in Fiscal Year 2008

U354 – 68 – 19.96
CMAQ – 0068 – (129) E
CMAQ – 0068 – (130) E
CMAQ – 0068 – (131) E

WV 68 – Emerson Ave./36 th Street intersection realignment. Includes signal renovation and construction of turn lane on 36 th St..
Changed from $650,000 to $691,000. Federal share of construction phase changed from $228,000 to $261,000.
Engineering phase moved from Fiscal Year 2009 to Fiscal Year 2008. Right-of-way phase remains in Fiscal Year 2009. Construction phase moved from Fiscal Year 2010 to Fiscal Year 2009.

S318 - 0 77 – 144.00
IMG – 0773 (378) E

I-77 sign renovation project from Ravenswood interchange to Ohio State line.
$1,000,000
Construction phase moved from Fiscal Year 2008 to Fiscal Year 2010

S354-77-157.00 00
IM-0773 (392) E

I-77 – Resurface (1.5”) from Jackson Co. line to CR 21/31 overpass. Includes removing overlay, paving shoulders, and guardrails.

Changed from $1,150,000 to $1,365,000. Federal share of construction cost changed from $1,035,000 to $1,229,000.

Construction phase moved from Fiscal Year 2010 to Fiscal Year 2011

S354-77-160.34
IM-0773 (389) E

I-77 – Resurface (1.5”) remove overlay, pave shoulders, guardrails from CR 21/31 overpass to CR 21/24 overpass.

Changed from $1,700,000 to $2,090,000. Federal share of construction phase changed from $1,530,000 to $1,881,000.

Construction phase moved from Fiscal Year 2011 to Fiscal Year 2012

S354-77-181.93 00
IM-0773 (390) E

I-77 NB – Resurface (1.5”) from 1.87 miles north of WV2 interchange to the Ohio River Bridge. Includes removing overlay, paving shoulders and guardrails.

Changed from $1,350,000 to $1,603,000. Federal share of construction phase changed from $1,215,000 to $1,442,000.

Construction phase moved from Fiscal Year 2010 to Fiscal Year 2011

S354-77-173.72
IM-0773 (257)
NH – 0073 (361)

Widen I-77 to 6 lanes including two bridges from .7 miles south of WV 47 to the north end of WV 47 bridge ( Staunton Avenue interchange – safety upgrade).

Changed from $17,588,000 to $19,509,000. Federal share of construction phase changed from $15,196,000 to $16,904,000.

Right-of-way remains in Fiscal Year 2008.

onstruction remains in Fiscal Year 2009.

T654-77-186.79 00
BR-NBIS (356) E

Williamstown/Marietta Br. Over Ohio River. 6 year inspection.
$480,000
Project moved from Fiscal Year 2009 to 2008

U354-95-4.84
NHG-0095 (068) E

Intersection of Camden Avenue and Broadway Avenue – Signal renovation project.

Changed from $360,000 to $386,000. Federal share of construction phase changed from $360,000 to $386,000.

Construction phase remains in Fiscal Year 2008

West Virginia TIP Project Revisions

Project #

Project Description

Revision

S354-14-18.34 00
NH-0014 (101) E

WV 14 – Grand Central Avenue – Resurface (1”) from 0.74 miles south of CR 12 to 0.18 miles south of CR 21/4.

Deleted

S354-47-8.22 00
STP-0047 (041) E

WV 47 – Resurface (1”) from 1.19 miles east of CR 47/17 to CR 47/10.

Deleted

S354-50-5.67 00
NH – 0050 (249) E

US 50 – Resurface (1.5”) beginning milepost 5.67 to 0.9 miles west of CR 50/4. Project includes guardrails.

Deleted

S354-68-0.00 00
STP-0068 (124) E

WV 68 – Resurface (1”) from Jackson Co. line to CR 2/2.

Deleted

354-68-19.06 00
NH-0068 (122) E

WV 68/ - Emerson Avenue – Resurface (1”) rotomill from WV 14 to 0.03 miles south of CR 2/7.

Deleted

S354-95-3.40 00
NH – 0095 (067) E

WV 95 – Camden Avenue – Resurface (1”) from WV 14 to CR 21/16.

Deleted

Ohio New TIP Projects (Amendments)

Project #

Project Description

Total Project Cost

Schedule

PID 82958
WAS-Marietta Detour Study

Marietta : Traffic operations study in preparation for Washington Street Bridge closure.
$37,300
FY 2008

PID 82996
WAS-50-01.97 LT

Belpre Township : Concrete deck overlay.
$355,900
FY 2011

PID 83259
WAS-CR9-4.91

Newport and Lawrence Townships: Full depth resurfacing, plus guardrail and pavement marking.

$601,400
FY 2009

PID 83255
WAS-CR10-00.00

Constitution, Warren Township: Repair joints and base concrete, resurfacing with asphalt, apply pavement markings.

$287,875
FY 2011

PID 83253
WAS-CR51-00.00

Belpre and Dunham Townships: Repair joints and base concrete, resurface with asphalt, apply pavement markings.
$138,010
FY 2011

PID 82799
WAS-US50-8.61

Construct two left turn lanes at the intersection of WAS SR7 and Braun Rd., add two left turn signal heads. Revise project to include the same improvement at the intersection of SR 7 and Farson St.

Revised from $359,817 to $719,634. MPO funding to be capped at $575,707.

FY 2010

Ohio TIP Project Revisions

Project #

Project Description

Revision

PID 79105
WAS-SR618-3.80

Belpre: Intersection improvement at Farson Street and SR618. Work includes construction of a through lane and possible signal pole relocation.

Increase MPO funding from $244,000 to $259,659.92.

 


P.O. Box 247, 531 Market Street Parkersburg, WV 26101, Phone: 304.422.4993 Fax: 304.422.4998