2006-2009 TIP Amendments

March 30, 2007 | December 20, 2006 | September 25, 2006 | May 25, 2006 | March 31, 2006

The following amendments will be made to the 2006-2009 Transportation Improvement Program at the March 30, 2007 meeting of the WWW Board.

West Virginia New TIP Projects (Additions)

Project #

Project Description

Total Project Cost

Schedule

U354-95-4.84
NHG-0095(068)E

WV95: Intersection of Camden Avenue and Broadway Avenue - Signal renovation project.

$360,000

FY 2008

U354-14-8.69
STP-0014(113)E

WV14: Mineral Wells/Pettyville-Construct 4-lanes from 0.10 miles north of Co. 21/34 to 0.04 miles north of Co. 21/15.

$8,950,000

Engineering - FY07
Right-of-Way - FY08
Construction – FY09

U354-14-9.54
STP-0014(115)E

WV14: Slide repair in Pettyville area at milepost 9.54-9.73.

$2,300,000

FY 2008

Ohio TIP Project Revisions

Project #

Project Description

Revisions

PID 25881
WAS-7-23.84

SR7 widening project for the City of Marietta. Work includes adding lanes, turn lanes, and coordinating traffic signals.
Move the construction phase from PID 25081 and include it in PID 76224 (ODOT portion of project). Engineering and right-of-way remain in PID 25881.

PID 20256
WAS-7-21.52

Rehabilitation of the Washington St. Br. Includes engineering study and final development plans for superstructure. Includes construction phase.
Construction phase moved from FY 2008 to FY 2009.

The following amendments were made to the 2006-2009 Transportation Improvement Program at the December 20, 2006 meeting of the WWW Board.

Ohio New TIP Projects (Additions)

Project #

Project Description

Total Project Cost

Schedule

PID 82075
WAS-SR60-4.84

Installation of culvert liner in 96 inch corrugated metal pipe. Begin 0.02 miles north of CR 341 (Masonic Park Rd.)

$377,200
FY 2007

Ohio TIP Project Revisions

Project #

Project Description

Revisions

PID 75859
WAS-SR 676-24.13

Drainage improvement project on Lancaster Street (Harmar Hill).

Increased the MPO funding maximum from $193,866 to $211,366.

PID 25881
WAS-SR7-23.84

SR7 widening project for the City of Marietta. Work includes Adding lanes, turn lanes and coordinating traffic signals.

Increase the MPO funding maximum from $483,476 to $526,003.

PID 79105
WAS-SR618-3.80

Intersection Improvement in the City of Belpre. Includes construction of a through lane and possible signal pole relocation. Junction of Washington Blvd. and Farson Street.

Increase MPO funding maximum from $200,000 to $243,648.

PID 81367
WAS-CR 446-0.00

Resurfacing on CR446 0.00-0.44. Begin at SR676.

Increase MPO funding maximum from $59,920 to $62,320.

The following amendments were made to the 2006-2009 Transportation Improvement Program at the September 25, 2006 meeting of the WWW Board.

West Virginia New TIP Projects (Additions)

Project #

Project Description

Total Project Cost

Schedule

U354-14-11.08 00
CMAQ-0014(108)E
CMAQ-0014(109)E
CMAQ-0014(110)E

WV14/Gihon Road-Intersection improvements including the Construction of a right turn lane from 500’ south on Gihon Road to 500’ north Gihon Road. Project includes traffic signal upgrade.

Engineering -$15,000
Right-of-Way - $435,000 Construction-$450,000

FY 2009
FY 2009
FY 2010 (included for Informational Purposes)

U354-14-15.19 00
NHG-0014(107)E

Sign renovation project from the intersection of WV14 and WV68 in Parkersburg to the intersection of WV14 and CR 21/39 in Vienna.

$400,000

FY 2008

U354-95-4.84 00
NHG-0095(068)E

Intersection of Camden Avenue and Broadway Avenue: Signal renovation project.

$360,000

FY 2010 (included for Informational Purposes)

Ohio New TIP Projects (Additions)

Project #

Project Description

Total Project Cost

Schedule

PID 81309
WAS-SR7-10.20

Four-lane preventive maintenance micro-surfacing project. Begin 0.09 miles north of Township Route 358 (Lockhart Rd.).
$280,800
FY 2009

PID 81367
WAS-CR 446-0.00

Resurfacing and minor intersection widening to improve turning movements on CR 446 0.00-0.43. Begin at SR 676.

$75,900
FY 2008
PID 81806
WAS-Marietta River Trail Phase 2
Marietta River Bike Trail - COnstruct extension south from the Marietta Harbor (termini for Phase 1) and then north along the Ohio River to Fourth Street.
$824,000
FY 2009

Ohio TIP Project Revisions

Project #

Project Description

Revisions

PID 79098
WAS-SR60-1.73

Marietta-Two lane resurfacing. Includes mill and fill with asphalt. Begin at Marion St. and end at North Corp. limit near ODOT building.

Move project from FY07 to FY09 and increase MPO funding cap from $250,000 to $303,000.

PID 76225
WAS-CR60-5.06

Two lane resurfacing-Includes Lowell Bridge (paving only). Begin at CR79, end at SR60 in Lowell Village.

Increase MPO funding cap from $51,872 to $76,886.

PID 79105
WAS-SR618-3.80

Intersection improvement in the City of Belpre. Includes construction of a through lane and possible signal pole relocation. Junction of Washington Blvd. and Farson Ave.

Change MPO funding type from STP to CMAQ.

The following amendments were made to the 2006-2009 Transportation Improvement Program at the May 25, 2006 meeting of the WWW Board.

West Virginia New TIP Projects (Additions)

Project #

Project Description

Total Project Cost

Schedule

U354-50-4.83 00
NHG-0050(271)E
NHG-0050(272)E

US50 - Sign renovation project (various locations)

Engineering - $250,000
Construction - $1,000,000

FY 2007
FY 2008

U354-47-2.75
STPG-0047(045)E

New signal at the WV47/I-77 SB entrance ramp. Modification of the existing signal at the NB exit/entrance ramp.

$280,000

FY 2008

S354-47-0.74 00
STP-0074(044)E

WV47 - Seed and mulch from 0.74 miles east of US50 to 1.04 miles east of US50.

$150,000

FY 2007

West Virginia TIP Project Revisions

Project #

Project Description

Revision

U354-14-7.47
STP-0014(067)E
EB-0014(067)E

WV14 - Upgrade to 4-lanes from north ramp of I-77 interchange to 0.3 miles east of CR14/1.

Change federal funding type for construction phase from STP to EB (Equity Bonus).

X354-D-0.63 06
APD-0282(143)E

River Hill Road Bridge - Construct bridge from 0.13 miles north of Corridor D to 0.15 miles north of Corridor D.

Change in total project cost from $2,875,000 to $4,325,000. Construction phase moved from FY 2006 to FY 2007.

Ohio TIP Project Revisions

Project #

Project Description

Revision

PID 25881
WAS-7-23.84

Marietta - Widening a section of SR7 from Acme Street to CR344 (County House Lane). Includes adding thru lanes and coordinating traffic signals.

Move project from FY06 to FY07. Increase MPO-STP funding from $403,122 to $483,476.

The following amendments were made to the 2006-2009 Transportation Improvement Program at the March 31, 2006 meeting of the WWW Board.

West Virginia New TIP Projects (Additions)

Project #

Project Description

Total Project Cost

Schedule

X254-14-7.47
STP-0014(106)E

WV14 – south of Mineral Wells Interchange. From northbound ramp of I-77 to 0.3 mi. E. of Co. 14/1. Environmental Study.

$60,000

FY 2006

S318-77-144.00
IMG-0773(378)E

Sign renovation project on I-77. Project currently on the TIP. Amendment includes the addition of the engineering phase.

$1,300,000
Eng.-$300,000

FY 2006

U354-68-19.96
CMAQ-0068-(129)E
CMAQ-0068-(130)E
CMAQ-0068-(131)E

WV68-36 th Street intersection improvements. Includes signal renovations and construction of turn lane 500’ south on 36 th Street to 500’ north on 36 th Street.

$650,000

FY 2009

West Virginia TIP Project Revisions

Project #

Project Description

Revision

U354-2-23.11 03
NH-0002(384)

WV2 – Reconstruct to 5 lanes from CR 16/3 to CR 3/8.

Construction funding revision from $6,765,000 to $6,762,000.

U354-14-7.47
STP-0014(067)E

WV14 – 4 lane upgrade east of I-77.

Contract plans funding revision from $400,000 to $544,000. Right-of-Way phase moved from FY 06 to FY 07.

S354-77-173.72
IM-0773(257)

I-77 widening to 6 lanes including two bridges

Right-of-way moved from FY06 to FY 07. Construction moved from FY07 to FY 09.

S354-77-173.22
IM-0773(273)

I-77 interchange bridge-over WV95/Camden Avenue. Widen to 6 lanes.

Move construction phase from FY07 to FY 09.

S354-50-3.43
BR-0050(147)E

Renovate Winans Arch. Culverts at Worthington Cr. (US50).

Move construction phase from FY07 to FY 09.

S354-32-0.40
BR-0032(024)E

Replace Sundowner Bridge.
Move construction phase from FY06 to FY 09.

S354-47-10.43
STP-0047(038)E

WV47-resurfacing from CR47/10 to Wirt Co. line.

Total project cost revised from $630,000 to $830,000. Construction phase moved from FY06 to FY 07.

S354-14-13.57
NH-0014(098)E

WV14/northbound-Resurfacing from 5th & Green to Juliana and 8th Streets.

Total project cost revised from $175,000 to $200,000.

S354-47-5.96
STP-0047(039)E

WV47-Resurfacing from CR26 to 1.38 m. W. of CR 47/9.

Total project cost revised from $385,000 to $415,000. Construction moved from FY07 to FY 06.

U354-68-1.66
CMAQ-0068(127)E

WV68-Ann St .-add Rt. Turn lane.

Engineering phase moved from FY 06 to FY 07. Construction phase moved from FY 07 to FY 08.

U354-14-13.57
CMAQ-0014(105)E

WV14-Green Street -dual Rt. Turn lane.

Engineering phase moved from FY06 to FY 07. Construction phase moved from FY07 to FY 08.

S354-95-3.40
NH-0095(067)E

WV95-Camden Avenue-Resurface from WV14 to Cr 21/16.

Total project cost increase from $800,000 to $1,150,000. Construction moved from FY08 to FY 09.

Ohio New TIP Projects (Additions)

Project #

Project Description

Total Project Cost

Schedule

PID 75859
WAS-SR676-24.13

Drainage Improvement project on Lancaster Street (Harmar Hill) in the City of Marietta. Begins at Bartlet Street and ends at SR 7.

$293,333
FY 08

Ohio TIP Project Revisions

Project #

Project Description

Total Project Cost

Schedule

PID 80843
WAS-US50-1.97LT

Belpre Township: Painting three bridges on US50 at milage points 1.97 left, 1.97 right, on 4.04.

$1,620,000 (100% State)

FY 08

 