2006-2009 TIP Amendments
March 30, 2007 | December 20, 2006 | September 25, 2006 | May 25, 2006 | March 31, 2006
The following amendments will be made to the 2006-2009 Transportation Improvement Program at the March 30, 2007 meeting of the WWW Board.
West Virginia New TIP Projects (Additions) |
|
|
|
|
U354-95-4.84
NHG-0095(068)E
|
WV95: Intersection of Camden Avenue and Broadway Avenue - Signal renovation project.
|
$360,000 |
FY 2008 |
U354-14-8.69
STP-0014(113)E
|
WV14: Mineral Wells/Pettyville-Construct 4-lanes from 0.10 miles north of Co. 21/34 to 0.04 miles north of Co. 21/15.
|
$8,950,000
|
Engineering - FY07
Right-of-Way - FY08
Construction – FY09
|
U354-14-9.54
STP-0014(115)E
|
WV14: Slide repair in Pettyville area at milepost 9.54-9.73. |
$2,300,000 |
FY 2008 |
Ohio TIP Project Revisions |
Project # |
Project Description |
Revisions |
PID 25881
WAS-7-23.84
|
SR7 widening project for the City of Marietta. Work includes adding lanes, turn lanes, and coordinating traffic signals. |
Move the construction phase from PID 25081 and include it in PID 76224 (ODOT portion of project). Engineering and right-of-way remain in PID 25881. |
PID 20256
WAS-7-21.52
|
Rehabilitation of the Washington St. Br. Includes engineering study and final development plans for superstructure. Includes construction phase. |
Construction phase moved from FY 2008 to FY 2009. |
The following amendments were made to the 2006-2009 Transportation Improvement Program at the December 20, 2006 meeting of the WWW Board.
Ohio New TIP Projects (Additions) |
|
|
|
|
PID 82075
WAS-SR60-4.84
|
Installation of culvert liner in 96 inch corrugated metal pipe. Begin 0.02 miles north of CR 341 (Masonic Park Rd.)
|
$377,200 |
FY 2007 |
Ohio TIP Project Revisions |
Project # |
Project Description |
Revisions |
PID 75859
WAS-SR 676-24.13
|
Drainage improvement project on Lancaster Street (Harmar Hill).
|
Increased the MPO funding maximum from $193,866 to $211,366.
|
|
SR7 widening project for the City of Marietta. Work includes Adding lanes, turn lanes and coordinating traffic signals.
|
Increase the MPO funding maximum from $483,476 to $526,003.
|
|
Intersection Improvement in the City of Belpre. Includes construction of a through lane and possible signal pole relocation. Junction of Washington Blvd. and Farson Street.
|
Increase MPO funding maximum from $200,000 to $243,648.
|
PID 81367
WAS-CR 446-0.00
|
Resurfacing on CR446 0.00-0.44. Begin at SR676.
|
Increase MPO funding maximum from $59,920 to $62,320.
|
The following amendments were made to the 2006-2009 Transportation Improvement Program at the September 25, 2006 meeting of the WWW Board.
West Virginia New TIP Projects (Additions) |
|
|
|
|
U354-14-11.08 00
CMAQ-0014(108)E
CMAQ-0014(109)E
CMAQ-0014(110)E
|
WV14/Gihon Road-Intersection improvements including the Construction of a right turn lane from 500’ south on Gihon Road to 500’ north Gihon Road. Project includes traffic signal upgrade.
|
Engineering -$15,000
Right-of-Way - $435,000 Construction-$450,000
|
FY 2009
FY 2009
FY 2010 (included for Informational Purposes) |
U354-14-15.19 00
NHG-0014(107)E
|
Sign renovation project from the intersection of WV14 and WV68 in Parkersburg to the intersection of WV14 and CR 21/39 in Vienna.
|
$400,000
|
FY 2008 |
U354-95-4.84 00
NHG-0095(068)E
|
Intersection of Camden Avenue and Broadway Avenue: Signal renovation project.
|
$360,000 |
FY 2010 (included for Informational Purposes) |
Ohio New TIP Projects (Additions) |
|
|
|
|
PID 81309
WAS-SR7-10.20
|
Four-lane preventive maintenance micro-surfacing project. Begin 0.09 miles north of Township Route 358 (Lockhart Rd.). |
$280,800 |
FY 2009 |
PID 81367
WAS-CR 446-0.00
|
Resurfacing and minor intersection widening to improve turning movements on CR 446 0.00-0.43. Begin at SR 676.
|
$75,900 |
FY 2008 |
PID 81806
WAS-Marietta River Trail Phase 2 |
Marietta River Bike Trail - COnstruct extension south from the Marietta Harbor (termini for Phase 1) and then north along the Ohio River to Fourth Street. |
$824,000 |
FY 2009 |
Ohio TIP Project Revisions |
Project # |
Project Description |
Revisions |
PID 79098
WAS-SR60-1.73
|
Marietta-Two lane resurfacing. Includes mill and fill with asphalt. Begin at Marion St. and end at North Corp. limit near ODOT building.
|
Move project from FY07 to FY09 and increase MPO funding cap from $250,000 to $303,000.
|
|
Two lane resurfacing-Includes Lowell Bridge (paving only). Begin at CR79, end at SR60 in Lowell Village.
|
Increase MPO funding cap from $51,872 to $76,886.
|
PID 79105
WAS-SR618-3.80
|
Intersection improvement in the City of Belpre. Includes construction of a through lane and possible signal pole relocation. Junction of Washington Blvd. and Farson Ave.
|
Change MPO funding type from STP to CMAQ. |
The following amendments were made to the 2006-2009 Transportation Improvement Program at the May 25, 2006 meeting of the WWW Board.
West Virginia New TIP Projects (Additions) |
|
|
|
|
U354-50-4.83 00
NHG-0050(271)E
NHG-0050(272)E
|
US50 - Sign renovation project (various locations) |
Engineering - $250,000
Construction - $1,000,000
|
FY 2007
FY 2008
|
U354-47-2.75
STPG-0047(045)E
|
New signal at the WV47/I-77 SB entrance ramp. Modification of the existing signal at the NB exit/entrance ramp. |
$280,000 |
FY 2008 |
S354-47-0.74 00
STP-0074(044)E
|
WV47 - Seed and mulch from 0.74 miles east of US50 to 1.04 miles east of US50. |
$150,000 |
FY 2007 |
West Virginia TIP Project Revisions |
Project # |
Project Description |
Revision |
U354-14-7.47
STP-0014(067)E
EB-0014(067)E
|
WV14 - Upgrade to 4-lanes from north ramp of I-77 interchange to 0.3 miles east of CR14/1. |
Change federal funding type for construction phase from STP to EB (Equity Bonus). |
X354-D-0.63 06
APD-0282(143)E
|
River Hill Road Bridge - Construct bridge from 0.13 miles north of Corridor D to 0.15 miles north of Corridor D. |
Change in total project cost from $2,875,000 to $4,325,000. Construction phase moved from FY 2006 to FY 2007. |
Ohio TIP Project Revisions |
|
|
|
PID 25881
WAS-7-23.84
|
Marietta - Widening a section of SR7 from Acme Street to CR344 (County House Lane). Includes adding thru lanes and coordinating traffic signals. |
Move project from FY06 to FY07. Increase MPO-STP funding from $403,122 to $483,476. |
The following amendments were made to the 2006-2009 Transportation Improvement Program at the March 31, 2006 meeting of the WWW Board.
West Virginia New TIP Projects (Additions) |
|
|
|
|
X254-14-7.47
STP-0014(106)E
|
WV14 – south of Mineral Wells Interchange. From northbound ramp of I-77 to 0.3 mi. E. of Co. 14/1. Environmental Study.
|
$60,000 |
FY 2006 |
S318-77-144.00
IMG-0773(378)E
|
Sign renovation project on I-77. Project currently on the TIP. Amendment includes the addition of the engineering phase.
|
$1,300,000
Eng.-$300,000
|
FY 2006 |
U354-68-19.96
CMAQ-0068-(129)E
CMAQ-0068-(130)E
CMAQ-0068-(131)E
|
WV68-36 th Street intersection improvements. Includes signal renovations and construction of turn lane 500’ south on 36 th Street to 500’ north on 36 th Street. |
$650,000 |
FY 2009 |
West Virginia TIP Project Revisions |
| Project # |
Project Description |
Revision |
U354-2-23.11 03
NH-0002(384)
|
WV2 – Reconstruct to 5 lanes from CR 16/3 to CR 3/8. |
Construction funding revision from $6,765,000 to $6,762,000.
|
U354-14-7.47
STP-0014(067)E
|
WV14 – 4 lane upgrade east of I-77. |
Contract plans funding revision from $400,000 to $544,000. Right-of-Way phase moved from FY 06 to FY 07.
|
S354-77-173.72
IM-0773(257)
|
I-77 widening to 6 lanes including two bridges |
Right-of-way moved from FY06 to FY 07. Construction moved from FY07 to FY 09.
|
S354-77-173.22
IM-0773(273)
|
I-77 interchange bridge-over WV95/Camden Avenue. Widen to 6 lanes.
|
Move construction phase from FY07 to FY 09. |
S354-50-3.43
BR-0050(147)E
|
Renovate Winans Arch. Culverts at Worthington Cr. (US50). |
Move construction phase from FY07 to FY 09. |
S354-32-0.40
BR-0032(024)E
|
Replace Sundowner Bridge. |
Move construction phase from FY06 to FY 09. |
S354-47-10.43
STP-0047(038)E
|
WV47-resurfacing from CR47/10 to Wirt Co. line. |
Total project cost revised from $630,000 to $830,000. Construction phase moved from FY06 to FY 07.
|
S354-14-13.57
NH-0014(098)E
|
WV14/northbound-Resurfacing from 5th & Green to Juliana and 8th Streets.
|
Total project cost revised from $175,000 to $200,000. |
S354-47-5.96
STP-0047(039)E
|
WV47-Resurfacing from CR26 to 1.38 m. W. of CR 47/9. |
Total project cost revised from $385,000 to $415,000. Construction moved from FY07 to FY 06.
|
U354-68-1.66
CMAQ-0068(127)E
|
WV68-Ann St .-add Rt. Turn lane. |
Engineering phase moved from FY 06 to FY 07. Construction phase moved from FY 07 to FY 08.
|
U354-14-13.57
CMAQ-0014(105)E
|
WV14-Green Street -dual Rt. Turn lane. |
Engineering phase moved from FY06 to FY 07. Construction phase moved from FY07 to FY 08.
|
S354-95-3.40
NH-0095(067)E
|
WV95-Camden Avenue-Resurface from WV14 to Cr 21/16. |
Total project cost increase from $800,000 to $1,150,000. Construction moved from FY08 to FY 09.
|
Ohio New TIP Projects (Additions) |
|
|
|
|
PID 75859
WAS-SR676-24.13
|
Drainage Improvement project on Lancaster Street (Harmar Hill) in the City of Marietta. Begins at Bartlet Street and ends at SR 7.
|
$293,333 |
FY 08 |
Ohio TIP Project Revisions |
|
|
|
|
PID 80843
WAS-US50-1.97LT
|
Belpre Township: Painting three bridges on US50 at milage points 1.97 left, 1.97 right, on 4.04.
|
$1,620,000 (100% State) |
FY 08 |
|